Laserfiche WebLink
I <br /> I1 direct payroll costs of any Project, insurance costs directly identifiable to any specific <br /> 2 Project, penalties, any costs incurred regarding company owned Equipment normally <br /> I3 classified as a direct Project costs, etc. <br /> 4 Owner: The City of Everett, Washington. "Owner," and the "City" mean the same. <br /> 5 Owner's Representative: The person designated in writing by the Owner to act as its <br /> I 6 representative at the construction site and to perform construction inspection service and <br /> 7 administrative functions relating to this Contract. The terms "Engineer" or "Architect" shall <br /> 8 be interchangeable with Owner's Representative. <br /> r9 Person: Includes individuals, associations, firms, companies, corporations, partnerships, <br /> 10 and joint ventures. <br /> I 11 Project: The undertaking to be performed under the provisions of the Contract. <br /> 12 Provide: Furnish and install, complete in place. <br /> 13 Punch List: List of incomplete items of Work and of items of Work that do not conform to <br /> I14 the requirements of the Contract Documents. The Punch List is prepared after Substantial <br /> 15 Completion. <br /> 16 RCW: Means the Revised Code of Washington. <br /> I17 Schedule of Values: Allocation of Contract Sum to items of Work as provided in Section <br /> 18 1-09.3(3)(A) Schedule of Values. <br /> I19 Shall: Required conduct. <br /> 20 Shown: Refers to information presented on the Drawings, with or without reference to the <br /> 21 Drawings. <br /> 22 Specifications: Includes 2016 WSDOT/APWA Standard Specifications, all <br /> 23 Amendments herein, and all other Specifications in this Contract. <br /> I 24 Specify: Refers to information described, shown, noted or presented in any manner in any <br /> 25 part of the Contract. <br /> 26 Submittals: The information required by the Contract Documents provided by Contractor <br /> I27 to the Owner's Representative or Owner. <br /> 28 Total Float: The amount of time any given activity or path of activities may be delayed <br /> 29 before it will affect the Completion Date. <br /> 1 30 Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> 31 wheelchairs, and equestrian traffic. <br /> I 32 Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br /> 33 Contractor's Overhead costs realized by the result of reduced Project and/or Contractor <br /> 34 billings due to any reason whatsoever, including a Project Extension. <br /> I 35 Unit Price Work: Refers to items of Work identified by unit prices in the Bid or Proposal <br /> 36 form. <br /> 37 <br /> 38 <br /> I39 1-02 Bid Procedures and Conditions <br /> 40 <br /> I 41 1-02.1 Prequalification of Bidders <br /> 42 Section 1-02.1 is amended by adding the following: <br /> I City of Everett Page SP1-5 Special Provisions <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />