Laserfiche WebLink
I <br /> I1 The following new paragraph is inserted after the seventh paragraph: <br /> 2 <br /> I 3 The Contractor shall not use businesses (material suppliers, vendors, subcontractors, etc.) <br /> 4 with federal purchasing exclusions. Businesses with exclusions are identified using the <br /> 5 System for Award Management web page at www.SAM.gov. <br /> I 6 <br /> 7 1-08.5 Time for Completion <br /> 8 Item number 2 of the sixth paragraph is supplemented with the following: <br /> 9 <br /> 10 f. A copy of the Notice of Termination sent to the Washington State Department of <br /> 11 Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the <br /> 12 Notice of Termination by Ecology; and no rejection of the Notice of Termination by <br /> I <br /> 13 Ecology. This requirement will not apply if the Construction Stormwater General Permit <br /> 14 is transferred back to the Contracting Agency in accordance with Section 8-01.3(16). <br /> 15 <br /> I 16 1-08.7 Maintenance During Suspension <br /> 17 The fifth paragraph is revised to read: <br /> 18 <br /> I 19 <br /> 20 The Contractor shall protect and maintain all other Work in areas not used by traffic. All <br /> costs associated with protecting and maintaining such Work shall be the responsibility of <br /> 21 the Contractor. <br /> 22 <br /> 111 23 Section 1-09, Measurement and Payment <br /> 24 August 6, 2018 <br /> I 25 1-09.2(1) General Requirements for Weighing Equipment <br /> 26 The last paragraph is supplemented with the following: <br /> 27 <br /> I 28 When requested by the Engineer, the Contractor's representative shall collect the tickets <br /> 29 throughout the day and provide them to the Engineer's designated receiver, not later than <br /> 30 the end of shift, for reconciliation. Tickets for loads not verified as delivered will receive no <br /> 111 31 pay. <br /> 32 <br /> 33 1-09.2(2) Specific Requirements for Batching Scales <br /> 34 The last sentence of the first paragraph is revised to read: <br /> I 35 <br /> 36 Batching scales used for concrete or hot mix asphalt shall not be used for batching <br /> 37 other materials. <br /> I 38 <br /> 39 1-09.10 Payment for Surplus Processed Materials <br /> 40 The following sentence is inserted after the first sentence of the second paragraph: <br /> I 41 <br /> 42 For Hot Mix Asphalt, the Plan quantity and quantity used will be adjusted for the quantity of <br /> 43 Asphalt and quantity of RAP or other materials incorporated into the mix. <br /> 44 <br /> I45 Section 2-01, Clearing, Grubbing, and Roadside Cleanup <br /> 46 April 1, 2019 <br /> 1 47 2-01.2(3) Disposal Method No. 3 — Chipping <br /> 48 Item number 2 of the first paragraph is revised to read: <br /> I <br /> City of Everett Page AM-11 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />