Laserfiche WebLink
I <br /> 1 f. Repeating rumors about individuals in the Work Site that are considered to be <br /> 2 harassing or harmful to the individual's reputation. <br /> 3 <br /> 4 1-07.11(5) Sanctions <br /> 5 This section is supplemented with the following: <br /> 6 <br /> 7 Immediately upon the Engineer's request, the Contractor shall remove from the Work site <br /> 8 any employee engaging in behaviors that promote harassment, humiliation, fear or <br /> 9 intimidation including but not limited to those described in these specifications. <br /> 10 <br /> 11 1-07.11(6) Incorporation of Provisions <br /> 12 The first sentence is revised to read: <br /> 13 <br /> 14 The Contractor shall include the provisions of Section 1-07.11(2) Contractual Requirements <br /> 15 (1) through (5) and the Section 1-07.11(5) Sanctions in every subcontract including <br /> 16 procurement of materials and leases of equipment. <br /> 17 <br /> 18 1-07.15(1) Spill Prevention, Control, and Countermeasures Plan <br /> 19 The last sentence of the first paragraph is revised to read: <br /> 20111 <br /> 21 An SPCC Plan template and guidance information is available at <br /> 22 http://www.wsdot.wa.gov/environment/technical/disciplines/hazardous-materials/spill- <br /> 23 prevent-report. , <br /> 24 <br /> 25 1-07.16(2)A Wetland and Sensitive Area Protection <br /> 26 The first sentence of the first paragraph is revised to read: I <br /> 27 <br /> 28 Existing wetland and other sensitive areas, where shown in the Plans or designated by the <br /> 29 Engineer, shall be saved and protected through the life of the Contract. <br /> 30 <br /> 31 1-07.18 Public Liability and Property Damage Insurance <br /> 32 Item number 1 is supplemented with the following new sentence: <br /> 33 <br /> 34 This policy shall be kept in force from the execution date of the Contract until the Physical <br /> 35 Completion Date. <br /> 36 <br /> 37 Section 1-08, Prosecution and Progress <br /> 38 January 7, 2019 <br /> 39 1-08.1 Subcontracting <br /> 40 The first sentence of the seventh paragraph is revised to read: <br /> 41 <br /> 42 All Work that is not performed by the Contractor will be considered as subcontracting <br /> 43 except: (1) purchase of sand, gravel, crushed stone, crushed slag, batched concrete <br /> 44 aggregates, ready-mix concrete, off-site fabricated structural steel, other off-site fabricated 11145 items, and any other materials supplied by established and recognized commercial plants; <br /> 46 or (2) delivery of these materials to the Work site in vehicles owned or operated by such <br /> 47 plants or by recognized independent or commercial hauling companies hired by those <br /> 48 commercial plants. I <br /> 49 <br /> City of Everett Page AM-10 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> i <br />