My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The City advises all General Contractors and Subcontractors that numerous Federal, State, <br /> 2 and local regulations exist that could affect the procedures used in the completion of this <br /> I 3 Project. The City advises each prospective Contractor that they are responsible to be <br /> 4 aware of and comply with all applicable statutes and regulations. It is recommended that <br /> 5 each Contractor contact the local office of the following agencies for a list of applicable <br /> I <br /> 6 regulations and requirements that might affect the implementation of this Project: <br /> 7 <br /> 8 Federal Environmental Protection Agency <br /> 9 Washington Department of Health <br /> I 10 Washington Department of Ecology <br /> 11 Washington Department of Fisheries <br /> 12 Washington Department of Wildlife <br /> I 13 Washington Department of Labor & Industries <br /> 14 Puget Sound Air Pollution Control Agency <br /> 15 Municipal Building Department <br /> I 16 Municipal Planning Department <br /> 17 Municipal Public Works Department <br /> 18 <br /> 19 If the scope of Work in this Contract includes Work at the City of Everett Water Filter Plant <br /> I20 or the Waste Water Pollution Control Facility, the Contractor must comply with the <br /> 21 requirements of the Washington Department of Labor & Industries for such Work including, <br /> 22 but not limited to, Chapter 296-67 WAC. All costs associated or incurred in complying with <br /> I 23 these regulations or any other regulations listed above are considered incidental to the <br /> 24 Contract and are included in the Contractor's Proposal. <br /> 25 <br /> I <br /> 26 <br /> 27 In cases of conflict between different safety regulations, the more stringent regulation shall <br /> apply. <br /> 28 <br /> 29 The Washington State Department of Labor and Industries shall be the sole and paramount <br /> 30 administrative agency responsible for the administration of the provisions of the <br /> 31 Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> 32 <br /> I 33 The Contractor shall maintain at the Project site office, or other well-known place at the <br /> 34 Project site, all articles necessary for providing first aid to the injured. The Contractor shall <br /> 35 establish, publish, and make known to all employees, procedures for ensuring immediate <br /> I 36 removal to a hospital, or doctor's care, persons, including employees, who may have been <br /> 37 injured on the Project site. Employees should not be permitted to Work on the Project site <br /> 38 before the Contractor has established and made known procedures for removal of injured <br /> 39 persons to a hospital or a doctor's care. <br /> I 40 <br /> 41 The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of the <br /> 42 Contractor's plant, appliances, and methods, and for any damage or injury resulting from <br /> I 43 their failure, or improper maintenance, use, or operation. The Contractor shall be solely <br /> 44 and completely responsible for the conditions of the Project site, including safety for all <br /> 45 persons and property in the performance of the Work. This requirement shall apply <br /> I 46 continuously, and not be limited to normal working hours. The required or implied duty of <br /> 47 the Engineer to conduct construction review of the Contractor's performance does not, and <br /> 48 shall not, be intended to include review and adequacy of the Contractor's safety measures <br /> 49 in, on, or near the Project site. <br /> I50 <br /> I City of Everett Page SP1-39 Special Provisions <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.