Laserfiche WebLink
I 1 For excavations that have soil types and slopegeometries - <br /> yp defined in WAC 296 155 part N <br /> 2 and are between 4-feet and 20-feet in height, the Contractor shall submit Type 2 Working <br /> I 3 <br /> 4 Drawings. Required submittal elements include, at a minimum, the following: <br /> 5 1. A plan view showing the limits of the excavation and its relationship to traffic, <br /> I 6 structures, utilities and other pertinent project elements. If the stability of the <br /> 7 excavation requires no-load zones or equipment setback distances, those shall be <br /> 8 shown on the plan view. <br /> 9 <br /> I10 2. A typical or controlling cross section showing the proposed excavation, original <br /> 11 ground line, and locations of traffic, existing structures, utilities, site constraints, <br /> 12 surcharge loads, or other conditions that could affect the stability of the slope. If <br /> I 13 the stability of the excavation requires no-load zones or equipment setback <br /> 14 distances, those shall be shown in cross section. <br /> 15 <br /> I <br /> 16 <br /> 17 3. A summary clearly describing subsurface conditions, soil type for WAC 296-155 <br /> part N, and groundwater conditions, sequencing considerations, and governing <br /> 18 assumptions. <br /> 19 <br /> I20 Where WAC 296-155 part N requires an engineer's design, the Contractor shall submit <br /> 21 Type 2E Working Drawings. Required submittal elements include, at a minimum, the three <br /> 22 items above and the following additional items: <br /> I 23 <br /> 24 4. Supporting calculations for the design of the excavation, the soil and material <br /> 25 properties selected for design, and the justification for the selection for those <br /> I 26 properties, in accordance with the WSDOT Geotechnical Design Manual M 46-03. <br /> 27 <br /> 28 5. Safety factors, or load and resistance factors used, and justification for their <br /> 29 selection, in accordance with the WSDOT Geotechnical Design Manual M 46-03, <br /> I 30 and referenced AASHTO design manuals. <br /> 31 <br /> 32 6. A monitoring plan to evaluate the excavation performance throughout its <br /> I 33 design life. <br /> 34 <br /> 35 7. Any supplemental subsurface explorations made by the Contractor to meet the <br /> I 36 requirements for geotechnical design of excavation slopes, in accordance with the <br /> 37 WSDOT Geotechnical Design Manual M 46-03. <br /> 38 <br /> I 39 2-09.3(3)D Shoring and Cofferdams <br /> 40 The first sentence of the sixth paragraph is revised to read: <br /> 41 <br /> 42 Structural shoring and cofferdams shall be designed for conditions stated in this Section <br /> I 43 using methods shown in Division I Section 5 of the AASHTO Standard Specifications for <br /> 44 Highway Bridges Seventeenth Edition — 2002 for allowable stress design, or the AASHTO <br /> 45 LRFD Bridge Design Specifications for load and resistance factor design. <br /> I 46 <br /> I <br /> I City of EverettPage AM-13 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> 1 <br />