My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Section 3-01, Production from Quarry and Pit Sites <br /> 2 April 2, 2018 <br /> 3 3-01.1 Description <br /> 4 The first paragraph is revised to read: <br /> 5 <br /> 6 This Work shall consist of manufacturing and producing crushed and screened aggregates <br /> 7 including pit run aggregates of the kind, quality, and grading specified for use in the <br /> 8 construction of concrete, hot mix asphalt, crushed surfacing, maintenance rock, ballast, <br /> 9 gravel base, gravel backfill, gravel borrow, riprap, and bituminous surface treatments of all <br /> 10 descriptions. <br /> 11 <br /> 12 Section 4-04, Ballast and Crushed Surfacing <br /> 13 April 2, 2018 <br /> 14 4-04.3(5) Shaping and Compaction 1 <br /> 15 This section is supplemented with the following new paragraph: <br /> 16 <br /> 17 When using 100% Recycled Concrete Aggregate, the Contractor may submit a written <br /> 18 request to use a test point evaluation for compaction acceptance testing in lieu of <br /> 19 compacting to 95% of the standard density as determined by the requirements of Section 2- <br /> 20 03.3(14)D. The test point evaluation shall be performed in accordance with SOP 738. <br /> 21 <br /> 22 Section 5-01, Cement Concrete Pavement Rehabilitation <br /> 23 January 7, 2019 <br /> 24 5-01.2 Materials <br /> 25 The reference for Concrete Patching Material is revised to read: <br /> 26 <br /> 27 Concrete Patching Material, Grout, and Mortar 9-20.1 <br /> 28 <br /> 29 5-01.3(1)A1 Concrete Patching Materials <br /> 30 In this section, each reference to "9-20" is revised to read "9-20.1". <br /> 31 <br /> 32 5-01.3(4) Replace Cement Concrete Panel <br /> 33 This section's content is deleted and replaced with the following new subsections: <br /> 34 <br /> 35 5-01.3(4)A General <br /> 36 Curing, cold weather work, concrete pavement construction in adjacent lines, and <br /> 37 protection of pavement shall meet the requirements of Section 5-05.3(13) through Section <br /> 38 5-05.3(15). The Contractor, at no cost to the Contracting Agency, shall repair any damage <br /> 39 to existing pavement caused by the Contractor's operations. <br /> 40 <br /> 41 5-01.3(4)B Sawing and Dimensional Requirements <br /> 42 Concrete slabs to be replaced as shown in the Plans or staked by the Engineer shall be at <br /> 43 least 6.0 feet long and full width of an existing pavement panel. The portion of the panel to <br /> 44 remain in place shall have a minimum dimension of 6 feet in length and full panel width; <br /> 45 otherwise the entire panel shall be removed and replaced. There shall be no new joints <br /> 46 closer than 3.0 feet to an existing transverse joint or crack. A vertical full depth saw cut is <br /> 47 required along all longitudinal joints and at transverse locations and, unless the Engineer <br /> City of Everett Page AM-14 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.