Laserfiche WebLink
1 When concrete pavement is to be placed on HMA, the surface tolerance of the HMA shall 111 <br /> 2 be such that no surface elevation lies above the Plan grade minus the specified Plan depth <br /> 3 of concrete pavement. Prior to placing the concrete pavement, bring any such irregularities <br /> 4 to the required tolerance by grinding or other means allowed by the Engineer. <br /> 5 <br /> 6 5-04.5 Payment , <br /> 7 The paragraph following the Bid item "Crack Sealing-LF", per linear foot is revised to read: <br /> 8 <br /> 9 The unit Contract price per linear foot for"Crack Sealing-LF" shall be full payment for all <br /> 10 costs incurred to perform the Work described in Section 5-04.3(4)A. <br /> 11 <br /> 12 Section 5-05, Cement Concrete Pavement <br /> 13 April 1, 2019 ' <br /> 14 5-05.1 Description <br /> 15 In the first paragraph, "portland cement concrete" is revised to read "cement concrete". , <br /> 16 <br /> 17 5-05.2 Materials <br /> 18 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 19 <br /> 20 Cement 9-01 <br /> 21 <br /> 22 In the first paragraph, the section reference for Concrete Patching Material is revised to read "9- <br /> 23 20.1". <br /> 24 <br /> 25 The second paragraph is revised to read: <br /> 26 <br /> 27 Cementitious materials are considered to be the following: portland cement, blended <br /> 28 hydraulic cement, fly ash, ground granulated blast furnace slag and microsilica fume. <br /> 29 <br /> 30 5-05.3(1) Concrete Mix Design for Paving <br /> 31 The table title in item number 4 is revised to read Concrete Batch Weights. <br /> 32 <br /> 33 In item 4a, "Portland Cement" is revised to read "Cement". <br /> 34 <br /> 35 5-05.3(3)E Smoothness Testing Equipment <br /> 36 This section is revised to read: <br /> 37 <br /> 38 Inertial profilers shall meet all requirements of AASHTO M 328 and be certified in <br /> 39 accordance with AASHTO R 56 within the preceding 12 months. <br /> 40 <br /> 41 The inertial profiler operator shall be certified as required by AASHTO R 56 within three <br /> 42 years preceding profile measurement. <br /> 43 <br /> 44 Equipment or operator certification by other states or a profiler certification facility will be <br /> 45 accepted provided the certification meets the requirements of AASHTO R 56. <br /> 46 Documentation verifying certification by another state shall be submitted to the Engineer a <br /> 47 minimum of 14 calendar days prior to profile measurement. Equipment certification <br /> 48 documentation shall include the information required by part 8.5 and 8.6 of AASHTO R 56. <br /> 49 Operator documentation shall include a statement from the certifying state that indicates <br /> City of Everett Page AM-24 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />