My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Compression seal lands shall conform to Section9-04.1(4) and be sized as shown in the <br /> 9 <br /> 2 Plans. <br /> I 3 <br /> 4 6-02.3(14)C Pigmented Sealer for Concrete Surfaces <br /> 5 This section is supplemented with the following new paragraph: <br /> I 6 <br /> 7 Pigmented Sealer Materials shall be a product listed in the current WSDOT Qualified <br /> 8 Products List (QPL). If the pigmented sealer material is not listed in the current WSDOT <br /> I 9 <br /> 10 QPL, a sample shall be submitted to the State Materials Laboratory in Tumwater for <br /> evaluation and acceptance in accordance with Section 9-08.3. <br /> 11 <br /> 12 6-02.3(20) Grout for Anchor Bolts and Bridge Bearings <br /> I 13 The second, third and fourth paragraphs are revised to read: <br /> 14 <br /> 15 Grout shall be a workable mix with a viscosity that is suitable for the intended application. <br /> I 16 Grout shall not be placed outside of the manufacturer recommended range of thickness. <br /> 17 The Contractor shall receive concurrence from the Engineer before using the grout. <br /> 18 <br /> I <br /> 19 <br /> 20 Field grout cubes and cylinders shall be fabricated and tested in accordance with Section <br /> 9-20.3 when requested by the Engineer, but not less than once per bridge pier or once per <br /> 21 day. <br /> 22 <br /> 23 Before placing grout, the substrate on which it is to be placed shall be prepared as <br /> 24 recommended by the manufacturer to ensure proper bonding. The grout shall be cured as <br /> 25 recommended by the manufacturer. The grout may be loaded when a minimum of 4,000 psi <br /> I 26 compressive strength is attained. <br /> 27 <br /> 28 The fifth paragraph is deleted. <br /> I 29 <br /> 30 6-02.3(23) Opening to Traffic <br /> 31 This section is supplemented with the following new paragraph: <br /> I32 <br /> 33 After curing bridge approach slabs in accordance with Section 6-02.3(11), the <br /> 34 bridge approach slabs may be opened to traffic when a minimum compressive strength <br /> 35 of 2,500 psi is achieved. <br /> 36 <br /> I 37 6-02.3(24)C Placing and Fastening <br /> 38 This section is revised to read: <br /> 1 39 <br /> 40 The Contractor shall position reinforcing steel as the Plans require and shall ensure that the <br /> 41 steel is set within specified tolerances. Adjustments to reinforcing details outside of <br /> 42 specified tolerances to avoid interferences and for other purposes are acceptable when <br /> I43 approved by the Engineer. <br /> 44 <br /> 45 When spacing between bars is 1 foot or more, they shall be tied at all intersections. When <br /> I 46 spacing is less than 1 foot, every other intersection shall be tied. If the Plans require <br /> 47 bundled bars, they shall be tied together with wires at least every 6 feet. All epoxy-coated <br /> 48 bars in the top mat of the bridge deck shall be tied at all intersections, however they may be <br /> I 49 tied at alternate intersections when spacing is less than 1 foot in each direction and they <br /> 50 are supported by continuous supports meeting all other requirements of supports for epoxy- <br /> I City of EverettPage AM-39 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.