Laserfiche WebLink
1 Type Ill portland cement or blended hydraulic cement is permitted to be used inp recast <br /> 2 concrete units. <br /> 3 <br /> 4 6-02.3(28)B Casting <br /> 5 In the second paragraph, the reference to Section 6-02.3(25)B is revised to read Section 6- <br /> 6 02.3(25)C. <br /> 7 <br /> 8 6-02.3(28)D Contractors Control Strength <br /> 9 In the first paragraph, "WSDOT FOP for AASHTO T 23" is revised to read "FOP for AASHTO T <br /> 10 23". <br /> 11 <br /> 12 6-02.3(28)E Finishing <br /> 111 13 This section is supplemented with the following: <br /> 14 <br /> 15 The Contractor may repair defects in precast panels in accordance with Section 6-01.16. <br /> I 16 <br /> 17 Section 6-03, Steel Structures <br /> 18 January 7, 2019 <br /> 19 6-03.2 Materials <br /> 20 In the first paragraph, the material reference for Paints is revised to read: <br /> 21 <br /> 22 Paints and Related Materials 9-08 <br /> 23 <br /> 24 6-03.3(25)A3 Ultrasonic Inspection <br /> 25 The first paragraph (up until the colon) is revised to read: <br /> 26 <br /> 27 Complete penetration groove welds on plates 5/16 inch and thicker in the following welded <br /> 28 assemblies or Structures shall be 100 percent ultrasonically inspected: <br /> 29 <br /> 30 6-03.3(33) Bolted Connections <br /> 31 The first paragraph is supplemented with the following: <br /> 32 <br /> 33 After final tightening of the fastener components, the threads of the bolts shall at a <br /> 34 minimum be flush with the end of the nut. <br /> 35 <br /> 36 The following is inserted after the third sentence of the fourth paragraph: <br /> 37 <br /> 38 <br /> 39 When galvanized bolts are specified, tension-control galvanized bolts are not permitted. <br /> 40 Section 6-05, Piling <br /> 41 January 2, 2018 <br /> • <br /> 42 6-05.3(9)A Pile Driving Equipment Approval <br /> 43 The fourth sentence of the second paragraph is revised to read: <br /> 44 <br /> 45 For prestressed concrete piles, the allowable driving stress in kips per square inch shall be <br /> 46 0.095 • f'- plus prestress in tension, and 0.85f'c minus prestress in compression, where f'c <br /> 47 is the concrete compressive strength in kips per square inch. <br /> 48 <br /> City of Everett Page AM 43 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />