My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 Section 6-07, Painting <br /> 2 January 7, 2019 <br /> 111 3 6-07.1 Description <br /> 4 The first sentence is revised to read: <br /> 5 <br /> 6 This work consists of containment, surface preparation, shielding adjacent areas from work, <br /> 7 testing and disposing of debris, furnishing and applying paint, and cleaning up after painting <br /> 8 is completed. <br /> 9 <br /> 10 6-07.2 Materials <br /> 11 The material reference for Paint is revised to read: <br /> 121 13 Paint and Related Materials 9-08 <br /> 14 <br /> 15 6-07.3(1)A Work Force Qualifications for Shop Application of Paint I <br /> 16 This section is supplemented with the following new sentence: <br /> 17 <br /> 18 The work force may be accepted based on the approved facility. <br /> 19 111 <br /> 20 6-07.3(1)B Work Force Qualifications for Field Application of Paint <br /> 21 The first two paragraphs are revised to read: <br /> 22 <br /> 23 The Contractor preparing the surface and applying the paint shall be certified under <br /> 24 SSPC-QP 1 or NACE International Institute Contractor Accreditation Program (NIICAP) AS <br /> 25 1. <br /> 26 <br /> 27 The Contractor removing and otherwise disturbing existing paint containing lead and other <br /> 28 hazardous materials shall be certified under SSPC-QP 2, Category A or NIICAP AS 2. <br /> 29 <br /> 30 The third paragraph (up until the colon) is revised to read: <br /> 31 1 32 In lieu of the above SSPC or NIICAP certifications, the Contractor performing the specified <br /> 33 work shall complete both of the following actions: <br /> 34 <br /> 35 Item number 2 of the third paragraph is revised to read: <br /> 36 <br /> 37 2. The Contractor's quality control inspector(s) for the project shall be NACE-certified CIP <br /> 38 Level 3 or SSPC Protective Coating Inspector(PCI) Level 3. <br /> 39 <br /> 40 6-07.3(2) Submittals <br /> 41 The first paragraph is supplemented with the following: <br /> 42 <br /> 43 Each component of the plan shall identify the specification section it represents. <br /> 44 <br /> 45 6-07.3(2)B Contractor's Quality Control Program Submittal Component <br /> 46 The numbered list in the first paragraph is revised to read: <br /> 47 <br /> 48 1. Description of the inspection procedures, tools, techniques and the acceptance criteria I <br /> 49 for all phases of work. <br /> City of Everett Page AM-44 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.