My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 Thickness 6-07.3(8)A Paint Film <br /> ( ) Measur ement Gages <br /> 2 The first paragraph is revised to read: <br /> I 3 <br /> 4 Paint dry film thickness measurements shall be performed with either a Type 1 pull-off gage <br /> 5 or a Type 2 electronic gage as specified in SSPC Paint Application Specification No. 2, <br /> I 6 Procedure for Determining Conformance to Dry Coating Thickness Requirements. <br /> 7 <br /> 8 6-07.3(9) Painting New Steel Structures <br /> I 9 The last sentence of the second paragraph is revised to read: <br /> 10 <br /> 11 Welded shear connectors are not required to painted. <br /> 12 <br /> I13 The last paragraph is revised to read: <br /> 14 <br /> 15 Temporary attachments or supports for scaffolding, containment or forms shall not damage <br /> I 16 the paint system. <br /> 17 <br /> 18 6-07.3(9)A Paint System <br /> I 19 The first paragraph is revised to read: <br /> 20 <br /> 21 The paint system applied to new steel surfaces shall consist of the following: <br /> 22 <br /> I 23 Option 1 (component based paint system): <br /> 24 <br /> 25 Primer Coat— Inorganic Zinc Rich 9-08.1(2)C <br /> I 26 Intermediate Coat— Moisture Cured Polyurethane 9-08.1(2)G <br /> 27 Intermediate Stripe Coat— Moisture Cured Polyurethane 9-08.1(2)G <br /> 28 Top Coat— Moisture Cured Polyurethane 9-08.1(2)H <br /> I 29 <br /> 30 Option 2 (performance based paint system): <br /> 31 <br /> 32 Primer Coat— Inorganic Zinc Rich 9-08.1(2)M <br /> 33 Intermediate Coat— Epoxy 9-08.1(2)M <br /> 34 Intermediate Stripe Coat— Epoxy 9-08.1(2)M <br /> 35 Top Coat— Polyurethane 9-08.1(2)M <br /> I 36 <br /> 37 The following new paragraph is inserted after the first paragraph: <br /> 38 <br /> I 39 Paints and related materials shall be products listed in the current WSDOT Qualified <br /> 40 Products List (QPL). Component based paint systems shall be listed on the QPL in the <br /> 41 applicable sections of Section 9-08. Performance based systems shall be listed on the <br /> 42 current Northeast Protective Coatings Committee (NEPCOAT) Qualified Products List "A" <br /> I43 as listed on the WSDOT QPL in Section 9-08.1(2)M. If the paint and related materials for <br /> 44 the component based system is not listed in the current WSDOT QPL, a sample shall be <br /> 45 submitted to the State Materials Laboratory in Tumwater for evaluation and acceptance in <br /> I 46 accordance with Section 9-08. <br /> 47 <br /> 48 6-07.3(9)C Mixing and Thinning Paint <br /> I 49 This section is revised to read: <br /> 50 <br /> 1 City of EverettPage AM 47 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.