Laserfiche WebLink
I <br /> 1 The Contractor's quality control operations shall include a minimum monitoring and <br /> 2 documenting the following for each working day: <br /> 3 <br /> 4 Item number 1 in the fourth paragraph is revised to read: <br /> 5 <br /> 6 1. Environmental conditions for painting in accordance with ASTM E 337. <br /> 7 <br /> 8 Item number 4 in the fourth paragraph is revised to read: <br /> 9 <br /> 10 4. Pictorial of surface preparation guides in accordance with SSPC-VIS 1, 3, 4, and 5. <br /> 11 <br /> 12 Item number 5 in the fourth paragraph is revised to read: <br /> 13 <br /> 14 5. Surface profile by Keanne-Tator comparator in accordance with ASTM D 4417 and <br /> 15 SSPC PA17. <br /> 16 <br /> 17 6-07.3(4) Paint System Manufacturer's Technical Representative <br /> 18 This section is revised to read: <br /> 9 <br /> 2 <br /> 20 The paint system manufacturer's representative shall be present at the jobsite for the pre- <br /> 21 painting conference and for the first day of paint application, and shall be available to the <br /> 22 Contractor and Contracting Agency for consultation for the full project duration. <br /> 23 <br /> 24 6-07.3(5) Pre-Painting Conference <br /> 25 The second paragraph is revised to read: <br /> 26 <br /> 27 If the Contractor's key personnel change between any work operations, an additional <br /> 28 conference shall be held if requested by the Engineer. <br /> 29 <br /> 30 6-07.3(6)A Paint Containers <br /> 31 In item number 2 of the first paragraph, "Federal Standard 595" is revised to read "SAE AMS <br /> 32 Standard 595". <br /> 33 <br /> 34 6-07.3(6)B Paint Storage <br /> 35 Item number 2 of the second paragraph is revised to read: <br /> 36 <br /> 37 2. The Contractor shall monitor and document daily the paint material storage facility with <br /> 38 a high-low recording thermometer device. <br /> 39 <br /> 40 6-07.3(7) Paint Sampling and Testing <br /> 41 The first two paragraphs are revised to read: <br /> 42 <br /> 43 The Contractor shall provide the Engineer 1 quart of each paint representing each lot. <br /> 44 Samples shall be accompanied with a Safety Data Sheet. <br /> 45 <br /> 46 If the quantity of paint required for each component of the paint system for the entire project <br /> 47 is 20 gallons or less, then the paint system components will be accepted as specified in <br /> 48 Section 9-08.1(7). <br /> 49 <br /> City of Everett Page AM-46 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />