My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Rejected assemblies shall be repaired or recoated bythe Contractor, at no additional <br /> 2 expense to the Contracting Agency, in accordance with the powder coating manufacturer's <br /> 3 recommendation as detailed in the project-specific powder coating plan, until the <br /> 4 assemblies satisfy the acceptance testing requirements. <br /> 5 <br /> 6 6-07.3(12) Painting Ferry Terminal Structures <br /> 7 This section is revised to read: <br /> 8 <br /> 9 Painting of ferry terminal Structures shall be in accordance with Section 6-07.3 as <br /> 10 supplemented below. 111 <br /> 11 <br /> 12 This section is supplemented with the following new subsections: <br /> 13 <br /> 14 6-07.3(12)A Painting New Steel Ferry Terminal Structures <br /> 15 Painting of new steel Structures shall be in accordance with Section 6-07.3(9) except that <br /> 16 all coatings (primer, intermediate, intermediate stripe, and top) shall be applied in the shop <br /> 17 with the following exceptions: <br /> 18 <br /> 19 1. Steel surfaces to be field welded. <br /> 20 <br /> 21 2. Steel surfaces to be greased. <br /> 22 <br /> 23 3. The length of piles designated in the Plans not requiring painting. <br /> 24 <br /> 25 The minimum drying time between coats shall be as shown in the product data sheets, but <br /> 26 not less than 12 hours. The Contractor shall determine whether the paint has cured <br /> 27 sufficiently for proper application of succeeding coats. <br /> 28 <br /> 29 6-07.3(12)A1 Paint Systems <br /> 30 Paint systems for Structural Steel, which includes vehicle transfer spans and towers, <br /> 31 pedestrian overhead loading structures and towers, upland structural steel and other <br /> 32 elements as designated in the Special Provisions shall be as specified in Section 6- <br /> 33 07.3(9)A. I <br /> 34 <br /> 35 Paint systems for Piling, Landing Aids and Life Ladders shall be as specified in the <br /> 36 Special Provisions. <br /> 111 <br /> 37 <br /> 38 6-07.3(12)A2 Paint Color <br /> 39 Paint colors shall be as specified in the Special Provisions. <br /> 40 <br /> 41 6-07.3(12)A3 Coating Thickness <br /> 42 Coating thicknesses shall be as specified in the Special Provisions. <br /> 43 <br /> 44 6-07.3(12)A4 Application of Field Coatings <br /> 45 An on-site supervisor shall be present for each work shift at the project site. <br /> 46 <br /> 47 Upon completion of erection Work, all uncoated or damaged areas remaining, <br /> 48 including bolts, nuts, washers, splice plates, and field welds shall be prepared in <br /> 49 accordance with SSPC-SP 1, Solvent Cleaning, followed by SSPC-SP 11, Power Tool <br /> I <br /> 50 Cleaning to Bare Metal. Surface preparation shall be measured according to SSPC- <br /> 51 VIS 3. SSPC-SP 11 shall be performed for a minimum distance of 1 inch from the <br /> City of Everett Page AM-56 Amendments I <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.