My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 11 <br /> 2 The first sentence of the third to last paragraph is revised to read: <br /> I 3 <br /> 4 Where existing steel reinforcing bars inside deck repair areas show deterioration greater <br /> 5 than 20-percent section loss, the Contractor shall furnish and place steel reinforcing bars <br /> I <br /> 6 alongside the deteriorated bars in accordance with the details shown in the Standard Plans. <br /> 7 <br /> 8 The last paragraph is deleted. <br /> 9 <br /> I10 6-09.3(7) Surface Preparation for Concrete Overlay <br /> 11 The first seven paragraphs are deleted and replaced with the following: <br /> 12 <br /> I <br /> 13 Following the completion of any required further deck preparation the entire lane or strip <br /> 14 being overlaid shall be cleaned to be free from oil and grease, rust and other foreign <br /> 15 material that may still be present. These materials shall be removed by detergent-cleaning <br /> I 16 or other method accepted by the Engineer followed by sandblasting. <br /> 17 <br /> 18 After detergent cleaning and sandblasting is completed, the entire lane or strip being <br /> I 19 overlaid shall be cleaned in final preparation for placing concrete. <br /> 20 <br /> 21 Hand tool chipping, sandblasting and cleaning in areas adjacent to a lane or strip being <br /> 22 cleaned in final preparation for placing concrete shall be discontinued when final <br /> I 23 preparation is begun. Scarifying and hand tool chipping shall remain suspended until the <br /> 24 concrete has been placed and the requirement for curing time has been satisfied. <br /> 25 Sandblasting and cleaning shall remain suspended for the first 24 hours of curing time after <br /> 26 the completion of concrete placing. <br /> 27 <br /> 28 Scarification, and removal of the upper layer of concrete overlay when present, may <br /> I <br /> 29 proceed during the final cleaning and overlay placement phases of the Work on adjacent <br /> 30 portions of the Structure so long as the scarification and concrete overlay removal <br /> 31 operations are confined to areas which are a minimum of 100 feet away from the defined <br /> 32 limits of the final cleaning or overlay placement in progress. If the scarification and concrete <br /> I 33 overlay removal impedes or interferes in any way with the final cleaning or overlay <br /> 34 placement as determined by the Engineer, the scarification and concrete overlay removal <br /> 35 Work shall be terminated immediately and the scarification and concrete overlay removal <br /> I 36 equipment removed sufficiently away from the area being prepared or overlaid to eliminate <br /> 37 the conflict. If the grade is such that water and contaminants from the scarification and <br /> 38 concrete overlay removal operation will flow into the area being prepared or overlaid, the <br /> I39 scarification and concrete overlay removal operation shall be terminated and shall remain <br /> 40 suspended for the first 24 hours of curing time after the completion of concrete placement. <br /> 41 <br /> 42 6-09.3(11) Placing Concrete Overlay <br /> 1 43 The first sentence of item number 3 in the fourth paragraph is revised to read: <br /> 44 <br /> 45 Concrete shall not be placed when the temperature of the concrete surface is less than <br /> I <br /> 46 <br /> 47 45°F or greater than 75°F, and wind velocity at the construction site is in excess of 10 mph. <br /> 48 6-09.3(12) Finishing Concrete Overlay <br /> I 49 The third paragraph is deleted. <br /> 50 <br /> I City of EverettPage AM 63 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.