My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The last paragraph is deleted. <br /> 2 <br /> 3 6-09.3(13) Curing Concrete Overlay <br /> 4 The first sentence of the first paragraph is revised to read: <br /> 5 <br /> 6 As the finishing operation progresses, the concrete shall be immediately covered with a <br /> 7 single layer of clean, new or used, wet burlap. <br /> 8 <br /> 9 The last sentence of the second paragraph is deleted. <br /> 10 <br /> 11 The following two new paragraphs are inserted after the second paragraph: <br /> 12 <br /> 13 As an alternative to the application of burlap and fog spraying described above, the <br /> 14 Contractor may propose a curing system using proprietary curing blankets specifically <br /> 15 manufactured for bridge deck curing. The Contractor shall submit a Type 2 Working <br /> 16 Drawing consisting of details of the proprietary curing blanket system, including product <br /> 17 literature and details of how the system is to be installed and maintained. <br /> 18 <br /> 19 The wet curing regimen as described shall remain in place for a minimum of 42-hours. <br /> 20 <br /> 21 The last paragraph is deleted. <br /> 22 <br /> 23 6-09.3(14) Checking for Bond <br /> 24 The first sentence of the first paragraph is revised to read: <br /> 25 <br /> 26 After the requirements for curing have been met, the entire overlaid surface shall be <br /> 27 sounded by the Contractor, in a manner accepted by and in the presence of the Engineer, <br /> 28 to ensure total bond of the concrete to the bridge deck. <br /> 29 <br /> 30 The last sentence of the first paragraph is deleted. <br /> 31 <br /> 32 The second paragraph is deleted. <br /> 33 <br /> 34 Section 6-10, Concrete Barrier <br /> 35 August 6, 2018 <br /> 36 6-10.2 Materials <br /> 37 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 38 <br /> 39 Cement 9-01 <br /> 40 <br /> 41 6-10.3(6) Placing Concrete Barrier <br /> 42 The first two sentences of the first paragraph are revised to read: <br /> 43 <br /> 44 Precast concrete barriers Type 2, Type 4, Type F, precast single slope barrier, and <br /> 45 transitions shall rest on a paved foundation shaped to a uniform grade and section. The <br /> 46 foundation surface for precast concrete barriers Type 2, Type 4, Type F, precast single <br /> 47 slope barrier, and transitions shall meet this test for uniformity: When a 10-foot straightedge <br /> 48 is placed on the surface parallel to the centerline for the barrier, the surface shall not vary <br /> 49 more than 1/4 inch from the lower edge of the straightedge. <br /> City of Everett Page AM-64 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.