My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc Everett Station Parking Expansion
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc Everett Station Parking Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 3:08:45 PM
Creation date
10/18/2019 2:55:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
10/4/2019
Council Approval Date
9/18/2019
Department
Transportation Services
Department Project Manager
Vince Bruscas
Subject / Project Title
Everett Station Parking Expansion
Public Works WO Number
1807-018
Total Compensation
$1,026,969.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> i 1 <br /> 2 Section 6-11, Reinforced Concrete Walls <br /> 3 April 2, 2018 <br /> 4 6-11.2 Materials <br /> 5 In the first paragraph, the reference to "Aggregates for Portland Cement Concrete" is revised to <br /> 6 read: <br /> 7 <br /> 8 Aggregates for Concrete 9-03.1 <br /> 9 <br /> 10 Section 6-12, Noise Barrier Walls <br /> 11 August 6, 2018 <br /> 12 6-12.2 Materials <br /> 13 In the first paragraph, the reference to "Aggregates for Portland Cement Concrete" is revised to <br /> 14 read: <br /> 15 <br /> 16 Aggregates for Concrete 9-03.1 <br /> ' 17 <br /> 18 The first paragraph is supplemented with the following new material reference: <br /> 19 <br /> ' 20 Noise Barrier Wall Access Door 9-06.17 <br /> 21 <br /> 22 6-12.3(9) Access Doors and Concrete Landing Pads <br /> 23 The second paragraph is deleted and replaced with the following: <br /> 24 <br /> 25 All frame and door surfaces, except stainless steel surfaces, shall be painted in accordance <br /> 26 with Section 6-07.3(9). Primer shall be applied to all non-stainless steel surfaces. All primer <br /> ' 27 <br /> 28 coated exposed metal surfaces shall be field painted with the remaining Section 6-07.3(9)A <br /> paint system coats. The top coat, when dry, shall match the color specified in the Plans or <br /> 29 Special Provisions. <br /> 30 <br /> 31 This section is supplemented with the following: <br /> 32 <br /> 33 Access door deadbolt locks shall be capable of accepting a Best CX series core. The <br /> 34 Contractor shall furnish and install a spring-loaded construction core lock with each lock. <br /> 35 The Engineer will furnish the permanent Best CX series core for the Contractor to install at <br /> 36 the conclusion of the project. <br /> 37 <br /> 38 Section 6-13, Structural Earth Walls <br /> 39 August 6, 2018 <br /> 40 6-13.2 Materials <br /> 41 In the first paragraph, the reference to "Aggregates for Portland Cement Concrete" is revised to <br /> ' 42 read: <br /> 43 <br /> 44 Aggregates for Concrete 9-03.1 <br /> 45 <br /> 46 6-13.3(4) Precast Concrete Facing Panel and Concrete Block Fabrication <br /> 47 Item number 1 of the sixth paragraph is revised to read: <br /> City of Everett Page AM 65 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.