Laserfiche WebLink
1 <br /> 1 1 <br /> 2 Section 6-19, Shafts <br /> ' 3 January 7, 2019 <br /> 4 6-19.2 Materials <br /> ' 5 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 6 Cement Concrete" are revised to read: <br /> 7 <br /> 8 Cement 9-01 <br /> 9 Aggregates for Concrete 9-03.1 <br /> 10 <br /> ' 11 6-19.3(1)A Shaft Construction Tolerances <br /> 12 The last paragraph is supplemented with the following: <br /> 13 <br /> 14 The elevation of the top of the reinforcing cage for drilled shafts shall be within +6 inches <br /> 15 and -3 inches from the elevation shown in the Plans. <br /> 16 <br /> 17 6-19.3(2)D Nondestructive QA Testing Organization and Personnel <br /> ' 18 Item number 4 in the first paragraph is revised to read: <br /> 19 <br /> 20 4. Personnel preparing test reports shall be a Professional Engineer, licensed under Title <br /> 21 18 RCW, State of Washington, and shall seal the report in accordance with WAC 196- <br /> 1111 22 23-020. <br /> 23 <br /> 24 6-19.3(3)C Conduct of Shaft Casing Installation and Removal and Shaft <br /> 25 Excavation Operations <br /> 26 The first paragraph is supplemented with the following: <br /> 27 <br /> ' 28 <br /> 29 In no case shall shaft excavation and casing placement extend below the bottom of shaft <br /> excavation as shown in the Plans. <br /> 30 <br /> 31 6-19.3(6)E Thermal Wire and Thermal Access Point (TAPS) <br /> 32 The third sentence of the third paragraph is revised to read: <br /> 33 <br /> 34 The thermal wire shall extend from the bottom of the reinforcement cage to the top of the <br /> 35 <br /> 36 shaft, with a minimum of 5-feet of slack wire provided above the top of shaft. <br /> 37 The following new sentence is inserted after the third sentence of the third paragraph: <br /> 38 <br /> 39 All thermal wires in a shaft shall be equal lengths. <br /> 40 <br /> 41 6-19.3(9)D Nondestructive QA Testing Results Submittal <br /> 42 The last sentence of the first paragraph is revised to read: <br /> 43 <br /> 44 Results shall be a Type 2E Working Drawing presented in a written report. <br /> 45 <br /> City of Everett Page AM 67 Amendments <br /> Everett Station 80 Stall Parking Expansion June 2019 <br /> I <br />