Laserfiche WebLink
I <br /> 1 vii. The strategy for removing slurry wastewater from the shaft and I <br /> 2 containing the slurry wastewater once it has been removed from the <br /> 3 shaft. <br /> I <br /> 4 <br /> 5 viii. The strategy for monitoring infiltration activity and adapting methods to <br /> 6 ensure compliance. I 7 <br /> 8 ix. A contingency plan that can be implemented immediately if it becomes <br /> 9 evident that the controls in place or methods being used are not <br /> I <br /> 10 adequate. <br /> 11 <br /> 12 x. The strategy for cleaning up the infiltration location after the infiltration <br /> 13 activity is done. Cleanup shall include stabilizing any loose sediment on <br /> I <br /> 14 the surface within the infiltration area generated as a byproduct of <br /> 15 suspended solids in the infiltrated wastewater or soil disturbance <br /> 16 associated with BMP placement and removal. <br /> 17 <br /> 18 2. Shaft drilling mineral slurry, synthetic slurry, or slurry with polymer additives not <br /> 19 allowed for infiltration shall be contained and disposed of by the Contractor at an <br /> 20 accepted disposal facility in accordance with Section 2-03.3(7)C. Spoils that have <br /> I <br /> 21 come into contact with mineral slurry shall be disposed of in accordance with <br /> 22 Section 6-19.3(4)F. <br /> 23 I 24 8-01.3(1)C4 Management of Off-Site Water <br /> 25 This section is revised to read: <br /> 26 <br /> I <br /> 27 Prior to clearing and grubbing, the Contractor shall intercept all sources of off-site surface <br /> 28 water and overland flow that will run-on to the project. Off-site surface water run-on shall be <br /> 29 diverted through or around the project in a way that does not introduce construction related <br /> 30 pollution. It shall be diverted to its preconstruction discharge location in a manner that does <br /> 31 not increase preconstruction flow rate and velocity and protects contiguous properties and <br /> 32 waterways from erosion. The Contractor shall submit a Type 2 Working Drawing consisting <br /> 33 of the method for performing this Work. <br /> I <br /> 34 <br /> 35 8-01.3(1)E Detention/Retention Pond Construction <br /> 36 This section is revised to read: I 37 <br /> 38 Permanent or temporary ponds shall be constructed before beginning other grading and <br /> 39 excavation Work in the area that drains into that pond. Detention/retention ponds may be <br /> 40 constructed concurrently with grading and excavation when allowed by the Engineer. <br /> 41 Temporary conveyances shall be installed concurrently with grading in accordance with the <br /> 42 TESC Plan so that newly graded areas drain to the pond as they are exposed. <br /> 43 <br /> 44 8-01.3(2) Seeding, Fertilizing, and Mulching <br /> 45 This section's title is revised to read: <br /> 46 <br /> I <br /> 47 8-01.3(2) Temporary Seeding and Mulching <br /> 48 <br /> 49 8-01.3(2)A Preparation for Application <br /> I <br /> 50 This section is revised to read: <br /> City of Everett Page AM-76 Amendments <br /> I <br /> Everett Station 80 Stall Parking Expansion June 2019 <br />