Laserfiche WebLink
City of Everett 01 45 00 - 1 <br /> 3600 Smith Street Clean Up <br /> SECTION 01 45 00 - QUALITY CONTROL <br /> PART 1 - GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes administrative and procedural requirements for quality assurance • <br /> and quality control. <br /> ' B. Testing and inspecting services are required to verify compliance with requirements <br /> specified or indicated. These services do not relieve Contractor of responsibility for <br /> compliance with the Contract Document requirements. <br /> ' 1. Specified tests, inspections, and related actions do not limit Contractor's quality- <br /> control procedures that facilitate compliance with the Contract Document <br /> requirements. <br /> 2. Requirements for Contractor to provide quality-control services required by <br /> Engineer, City, or authorities having jurisdiction are not limited by provisions of this <br /> Section. <br /> C. Contractor will pay for all proctor tests for all materials used for fill. <br /> D. Owner will employ and pay for the services of sampling and testing contaminated soil as <br /> ' needed. <br /> 1.2 DEFINITIONS <br /> A. Quality-Assurance Services: Activities. actions, and procedures performed before and <br /> during execution of the Work to guard against defects and deficiencies and ensure that <br /> ' proposed construction complies with requirements. <br /> B. Quality-Control Services: Tests, inspections, procedures, and related actions during and <br /> ' after execution of the Work to evaluate that completed construction complies with <br /> requirements. Services do not include contract enforcement activities performed by <br /> Engineer. <br /> C. Testing Agency: An entity engaged to perform specific tests, inspections, or both. <br /> Testing laboratory shall mean the same as testing agency. <br /> 1.3 DELEGATED DESIGN <br /> ' A. Performance and Design Criteria: Where professional design services or certifications <br /> by a design professional are specifically required of Contractor by the Contract <br /> Documents, provide products and systems complying with specific performance and <br /> ' design criteria indicated. <br /> 1. If criteria indicated are not sufficient to perform services or certification required, <br /> submit a written request for additional information to Engineer. <br /> 01 45 00 - 1 QUALITY CONTROL <br />