My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
>
Contracts
>
Capital Contract
>
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 4:23:30 PM
Creation date
10/18/2019 4:16:56 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IO Environmental and Infrastructure Inc
Approval Date
9/25/2019
Council Approval Date
8/21/2019
Department
Transportation Services
Department Project Manager
Vince Bruscus
Subject / Project Title
Smith Street Cleanup and Fill Project
Total Compensation
$366,191.78
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I City of Everett <br /> 3600 Smith Street Clean Up Addendum No. 1 <br /> I LI <br /> I <br /> EVERETT <br /> WASHINGTON <br /> I ADDENDUM NO. 1 <br /> TO <br /> 3600 SMITH STREET CLEAN UP <br /> 1 July 10, 2019 <br /> I <br /> NOTICE TO BIDDERS <br /> Addendum No. 1 contains the following revisions, additions, deletions and classifications and is <br /> I <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> This Addendum No.1 consist of 1 pages, including all revisions,attachments. <br /> I SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> Il) Do you have soil analytical available? <br /> a. Yes documents are available at <br /> https://apps.ecology.wa.gov/gsp/Sitepage.aspx?csid=14477 <br /> I <br /> 2) What are contaminates of concern? <br /> a. cPAHS,diesel and lube oil range petroleum,PCBs and lead; disposal at Subtitle D site <br /> 3) Do the sample barrels on site need to be disposed of? <br /> I <br /> a. Yes, 13 barrels <br /> 4) Will GeoEngineer representative be on site to delineate the dig areas? <br /> a. Yes, a representative from GeoEngineers will be on site to mark the areas and field test <br /> dirt samples every day. <br /> I <br /> 5) When do you anticipate the project to occur? <br /> a. The project is expected to occur in September 2019. <br /> I <br /> 111 All other requirements of the plans and specifications remain in effect. <br /> 1 END OF ADDENDUM NO. 1 <br /> 1 'e,eipt • • ea endum 1 Acknowledged <br /> IO n •n ental and In rastructure, Inc. <br /> IBrad Cou General Manager PN A Page 1 of 1 <br /> II'rovided <br /> to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.