My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
>
Contracts
>
Capital Contract
>
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 4:23:30 PM
Creation date
10/18/2019 4:16:56 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IO Environmental and Infrastructure Inc
Approval Date
9/25/2019
Council Approval Date
8/21/2019
Department
Transportation Services
Department Project Manager
Vince Bruscus
Subject / Project Title
Smith Street Cleanup and Fill Project
Total Compensation
$366,191.78
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 63 25 - 1 <br /> 3600 Smith Street Clean Up <br /> i <br /> SECTION 00 63 25 - SUBSTITUTION REQUEST FORM <br /> I <br /> PROJECT: 3600 Smith Street Clean Up REQUEST NO.: <br /> CONTRACTOR: DATE: <br /> We hereby submit for consideration, following product instead of specified item for <br /> above project: <br /> Section Specified Item <br /> ' Proposed Substitution <br /> Attach complete technical data, including laboratory tests, and samples, as applicable. <br /> Attach detailed comparison of the significant qualities (size, weight, durability, <br /> performance and similar characteristics, and including visual effect where applicable) for <br /> 1 the proposed substitution in comparison with the original requirements. <br /> List complete installation changes and changes to Drawings and Specifications required <br /> by proposal. <br /> Fill in Blanks Below: <br /> A. Does substitution require change in drawing dimensions? <br /> B. Will Undersigned pay for resulting building design changes including engineering <br /> and detailing costs? <br /> C. What effect does substitution have on other trades? <br /> D. Differences between proposed substitution and specified item? <br /> E. Manufacturer's guarantees of proposed and specified items are: <br /> Same Different (Explain on attachment) <br /> F. Name and address of three (3) similar projects on which product was used, and <br /> date of installation <br /> I <br /> G. Contract completion date is: Same Different (Explain on attachment). <br /> H. Cost Savings? <br /> 00 63 25 - 1 SUBSTITUTION REQUEST FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.