My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
>
Contracts
>
Capital Contract
>
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 4:23:30 PM
Creation date
10/18/2019 4:16:56 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IO Environmental and Infrastructure Inc
Approval Date
9/25/2019
Council Approval Date
8/21/2019
Department
Transportation Services
Department Project Manager
Vince Bruscus
Subject / Project Title
Smith Street Cleanup and Fill Project
Total Compensation
$366,191.78
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 63 25 - 2 <br /> 3600 Smith Street Clean Up <br /> Undersigned attests function and quality equivalent or superior to specified item and waives his <br /> rights to additional payment and time which may subsequently be necessitated, by failure of the <br /> substitution to perform adequately, and for the required work to make corrections thereof. I <br /> Signature must be by a person having authority to legally bind his firm to the above terms. <br /> Failure to provide legally-binding signature will result in approval retraction. <br /> Submitted by: <br /> Signature Date 1 <br /> Printed r <br /> Firm , <br /> Address <br /> Telephone I <br /> For use by Architect/Engineer: I <br /> Accepted Accepted as Noted Not Accepted Received Too <br /> Late <br /> BY: Date: <br /> Remarks: 1 <br /> For use by Owner: ' <br /> Accepted Accepted as Noted Not Accepted Received Too Late <br /> Project Manager Date I <br /> Remarks: <br /> END OF SECTION 00 63 25 <br /> I <br /> 00 63 25 - 2 SUBSTITUTION REQUEST FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.