My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
>
Contracts
>
Capital Contract
>
IO Environmental and Infrastructure Inc Smith Street Cleanup and Fill Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 4:23:30 PM
Creation date
10/18/2019 4:16:56 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IO Environmental and Infrastructure Inc
Approval Date
9/25/2019
Council Approval Date
8/21/2019
Department
Transportation Services
Department Project Manager
Vince Bruscus
Subject / Project Title
Smith Street Cleanup and Fill Project
Total Compensation
$366,191.78
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 72 00 - 3 <br /> 3600 Smith Street Clean Up <br /> The following costs and expenses are excluded from the definition and calculation of Overhead. <br /> Overhead costs that vary substantially with the volume of Work performed (as measured by billings) shall <br /> not be included in Overhead for the purpose of determining additional compensation for Extended or <br /> ' Unabsorbed Home Office Overhead or both. <br /> Examples of costs that are not included in Overhead include, but are not limited to, travel and business <br /> ' meetings,telephones, professional fees expended for the benefit of a specific project, union welfare <br /> benefits,payroll taxes and equipment rental. <br /> If related party transactions are included in a Contractor's Overhead,they shall be explicitly identified as <br /> ' related party transactions and shall not exceed amounts that would be incurred in an arms-length <br /> transaction for the provision of the same or similar goods and services. If such transactions exist and the <br /> amounts paid by the Contractor and included in Overhead are in excess of that which would normally be <br /> ' expended in an arms-length transaction, an adjustment, in the form of a reduction in the amount for <br /> calculation purposes, shall be included in any calculation in determining the amount of Allocable <br /> Overhead. <br /> ' Overhead shall not include any cost directly attributable to a particular project. If a cost can be traced to a <br /> particular Contract,the Contractor may not classify the cost as Overhead. <br /> Indirect or home office costs that vary substantially with the amount of Work performed shall not be <br /> ' included in the group of costs comprising Overhead. <br /> Overhead shall not include costs specifically disallowed by Federal Acquisition Regulations, Subpart 31.2 <br /> ' —Contracts with Commercial Organizations, or its successor. Further, "Overhead" shall not include the <br /> costs of"field support services"that are more closely direct costs in nature, regardless of the manner in <br /> which the Contractor normally accounts for such costs. An example of such disallowed cost would be for <br /> material handling and expediting, which are costs incurred for the direct support and benefit of specific <br /> project(s). <br /> In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples of specific costs <br /> not allowed in a calculation under this section of the Contract include, but are not limited to, Incentive <br /> ' Compensation paid to personnel classified as Overhead and otherwise includable under this section of <br /> Contract,travel and business meetings, employer paid benefits and taxes on direct payroll costs of any <br /> project, insurance costs directly identifiable to a specific project,penalties, and costs incurred regarding <br /> ' company owned equipment normally classified as a direct project costs. <br /> Owner: The City of Everett, Washington. "Owner" and the "City" mean the same. <br /> Owner's Representative: The person designated in writing and employed or retained by the Owner to <br /> act as its representative at the construction Site and to perform construction inspection service and <br /> administrative functions relating to this Contract. The terms "Owner's Representative", "Engineer" and <br /> "Architect"are interchangeable. <br /> Person: Includes individuals, associations, firms, companies, corporations, partnerships, and joint <br /> ventures. <br /> ' Physical Completion: Physical Completion Date is the day all of the Work is physically completed on <br /> the Project. All documentation required by the Contract and required by law does not necessarily need to <br /> be furnished by the Contractor by this date. <br /> ' Progress Schedule: A schedule prepared and maintained by Contractor, describing the sequence and <br /> duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract <br /> Time. <br /> ' Project: The undertaking to be performed under the provisions of the Contract. <br /> Punch List: List of incomplete items of Work and of items of Work that are not in conformance with the <br /> Contract Documents,prepared after Substantial Completion. <br /> RCW: Means the Revised Code of Washington. <br /> ' 00 72 00 - 3 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.