Laserfiche WebLink
4 <br />1.46. DliC1 AW%T]UN UL' t4UN-SIONIFTC& <br />s <br />/0/3/7 <br />propon0d action i.s the is:;uance of grading and building permits to allow the const:rdc:ti n <br />approximately 2.09,672 square feet of retail sales building to expand the existing Nvr.rett <br />Mail. The proposal includes a drugstcrc of: approximately 38,136 square feet; a major depart- <br />ment store with approximately 119,116 square feet; and miscellaneous retail shops of approxi- <br />mately 52,420 square feet. The following factors were considered and the listed roqui.rement:s <br />were placed in response to information provided and comments submitted by various departments <br />during the Environmental Checklist Review. of this proposal: <br />1. The site is zonod C-1, General Commercial Zone, which would allow the proposed use. The <br />development is an expansion of the existing Everett Mall retial shopping center on the <br />site, and would require building permits for each individual facility to be constructed. <br />2. A substantial portion of the'area proposed for expansion has been previously paved and <br />is currently used for parking or vehicle circulation. However, the southeastern portion <br />of the site is currectly heavily wooded with Alder and scattered large Fir, and a stand <br />of Fir exists adfacent to I-5. This wooded area will be eliminated and replaced with <br />parking for the expanded mall area. <br />3. The existing Mall has a private drainage detention system. Increased runoff will result <br />from the elimination of the wooded area and the additional impervious surface. Drainage <br />must be designed in conformance with the City's Drainage Ordinance. <br />4. The expanded Everett Mall will abut an existing and a proposed multiple family residential <br />area to the South. Adequate site screening and landscape buffer must be provided between <br />the commercial and residential uses. Landscaping of parking areas must be planned in <br />conformance with City Code. To the extent feasible, existing Evergreens should be saved <br />to accomplish site screening. <br />5. Access to the Mall site is currently from three points on South Broadway on the north <br />(with connections from the Snohomich County P.U.D. improved right-of-way (Roll) on the <br />west), and from 100th Street on the southwest. The P.U.D. ROW is not a publicly dedi- <br />cated street and its use may be terminated upon notice from the P.U.D. The P.U.D. access <br />is currently poorly maintained. Traffic generated by, 209,672 square feet of retail sales <br />area will be added to these streets. <br />The proposed expansion would generate an estimated 4,000 additional vehicle trips per day, <br />raising the total vehicle trips per day generated by the expanded Everett Mall to 25,000. <br />The City's Street Improvement Ordinance 0555-78 must be complied with. Access, circulation <br />and parking plans are to be submitted to the Public Works Department for review and approval. <br />Plans are to include all abutting public right-of-way and show all required public improve- <br />ments. A list of specific traffic impact mitigating measures established by the City Traffic <br />Engineer are shown below and must be implemehtdd to the'extent-indirated below by the applicant. <br />a. A public right-of-way shill be'planned to extend frora South Broadway to.l00th Street <br />and shall include any Roll necessary to insure.a continuous, -public. road ROW. Except <br />as-notedbelow;-'this-North-South'ROW shall be acquired•and developed through a <br />local improvement district. <br />The applicant shall insure a permanent East -west easement across the P.U.D. ROW, <br />and the No.•th-South ROW shall provide adequate access to the internal driveway <br />and circulation system of the mall. <br />The North -South Roll shall be located at one of three alternative alignments: First, <br />a permanently dedicated non -revocable ROW located on the existing PUD ROW; second, <br />a❑ alignment immediately cast of the cxisti-ng PUD ROW;. and third, an alignment along <br />the western boundary of the planned Mall convenience store property and along the <br />west side of First Bank and the Cinema. <br />To insure the provision of adequate North -South public ROW the applicant shall <br />reserve for dedication a 70 foot- strip of property contiguous to the Last of the <br />existing PUD STOW on property currently under the Mall's direct control. For dedi- <br />cation, the applicant shall reserve the westerly 35 feet of its property at the <br />convenience store site located west of the PUD ROW. The applicant shall dedicate <br />a 70 foot wide Roil along the existing driveway, south of the Cinema, from 100th <br />Street to the existing PUD ROW. <br />