My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 ESC lead will be measured per day for each day that an inspection is made and a <br /> 2 report is filed. <br /> 3 <br /> 4 Erosion control blanket and plastic covering will be measured by the square yard <br /> I 5 along the ground slope line of surface area covered and accepted. <br /> 6 <br /> 7 Turbidity curtains will be measured by the linear foot along the ground line of the <br /> I 8 installed curtain. <br /> 9 <br /> 10 Check dams will be measured per linear foot one time only along the ground line of <br /> 11 the completed check dam. No additional measurement will be made for check dams <br /> 12 that are required to be rehabilitated or replaced due to wear. <br /> 13 <br /> 14 Stabilized construction entrances will be measured by the square yard by ground <br /> I 15 slope measurement for each entrance constructed. <br /> 16 <br /> 17 Tire wash facilities will be measured per each for each tire wash installed. <br /> I 18 <br /> 19 Street cleaning will be measured by the hour for the actual time spent cleaning <br /> 20 pavement, refilling with water, dumping and transport to and from cleaning locations <br /> I 21 within the project limits, as authorized by the Engineer. Time to mobilize the <br /> 22 equipment to or from the project limits on which street cleaning is required will not be <br /> 23 measured. <br /> 24 <br /> I 25 Inlet protections will be measured per each for each initial installation at a <br /> 26 drainage structure. <br /> 27 <br /> I 28 Silt fence, gravel filter, compost berms, and wood chip berms will be measured by <br /> 29 the linear foot along the ground line of the completed barrier. <br /> 30 <br /> I 31 Wattles and compost socks will be measured by the linear foot. <br /> 32 <br /> 33 Temporary curbs will be measured by the linear foot along the ground line of the <br /> 34 completed installation. <br /> I 35 <br /> 36 Temporary pipe slope drains will be measured by the linear foot along the flow line of <br /> 37 the pipe. <br /> I 38 <br /> 39 Coir logs will be measured by the linear foot along the ground line of the completed <br /> 40 installation. <br /> I 41 <br /> 42 Outlet protections will be measured per each initial installation at an outlet location. <br /> 43 <br /> 44 Temporary seeding. temporary mulching, and tackifiers will be measured by the acre <br /> I 45 by ground slope measurement. <br /> 46 <br /> 47 Compost blanket will be measured by the square yard by ground slope surface area <br /> I <br /> 48 covered and accepted. <br /> 49 <br /> I <br /> 111 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8112(2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.