Laserfiche WebLink
I <br /> 1 8-01.4(3) Reinstating Unit Items with Lump Sum Erosion Control and Water <br /> 2 Pollution Prevention <br /> 3 The Contract Provisions may establish the project as lump sum, in accordance with <br /> 4 Section 8-01.4(1) and also include one or more of the items included above in Section 8- <br /> 5 01.4(2).When that occurs, the corresponding measurement provision in Section 8-01.4(2) <br /> 6 is not deleted and the Work under that item will be measured as specified. <br /> 7 <br /> 8 8-01.4(4) Items not included with Lump Sum Erosion Control and Water I <br /> 9 Pollution Prevention <br /> 10 Compost blanket will be measured by the square yard by ground slope surface area <br /> 11 covered and accepted. <br /> 12 <br /> 13 Temporary mulch will be measured by the acre by ground slope surface area covered and <br /> 14 accepted. <br /> 15 <br /> 16 High visibility fence will be measured by the linear foot along the ground line of the <br /> 17 completed fence. <br /> 18 1 <br /> 19 8-01.5 Payment <br /> 20 This section's content is deleted and replaced with the following new subsections: <br /> 21 I 22 8-01.5(1) Lump Sum Bid for Project (No Unit Items) <br /> 23 Payment will be made for the following Bid item when it is included in the Proposal: <br /> 24 <br /> 25 "Erosion Control and Water Pollution Prevention", lump sum. <br /> 26 <br /> 27 The lump sum Contract price for "Erosion Control and Water Pollution Prevention" <br /> 28 shall be full pay to perform the Work as described in Section 8-01 except for costs <br /> 29 compensated by Bid Proposal items inserted through Contract Provisions as <br /> 30 described in Section 8-01.4(2). Progress payments for the lump sum item "Erosion <br /> 31 Control and Water Pollution Prevention" will be made as follows: <br /> 32 <br /> 33 1. The Contracting Agency will pay 15 percent of the bid amount for the initial <br /> 34 set up for the item. Initial set up includes the following: <br /> 35 <br /> 36 a. Acceptance of the TESC Plan provided by the Contracting Agency or <br /> 37 submittal of a new TESC Plan, <br /> 38 1 <br /> 39 b. Submittal of a schedule for the installation of the BMPs, and <br /> 40 <br /> 41 c. Identifying water quality sampling locations. I <br /> 42 <br /> 43 2. 70 percent of the bid amount will be paid in accordance with Section 1-09.9. <br /> 44 '45 3. Once the project is physically complete and copies of the all reports <br /> 46 submitted to the Washington State Department of Ecology have been <br /> 47 submitted to the Engineer, and, if applicable, transference of the CSWGP <br /> 48 back to the Contracting Agency is complete, the remaining 15 percent of the <br /> 49 bid amount shall be paid in accordance with Section 1-09.9. <br /> 50 <br /> 51 8-01.5(2) Item Bids I <br /> 52 ''ESC Lead", per day. <br /> CITY OF EVERETT AMENDMENTS I <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-82 <br />