My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 foot intervals along the entire length of the live fascine. Live fascines shall be <br /> 2 installed horizontally in a trench whose depth shall be 1/2 the diameter of the live <br /> 3 fascine. Secure the live fascine with live stakes 3 feet in length and 3/ inch in <br /> 4 diameter placed at 18-inch intervals. A minimum of three live stakes shall be <br /> I <br /> 5 used per fascine. The live stakes shall be driven through the live fascine vertically <br /> 6 into the slope. The ends of live fascines shall be woven together so that no gap <br /> 7 remains between the two sections of the live fascine. <br /> I 8 <br /> 9 Prior to being covered with soil, the fascine shall be thoroughly watered. Once <br /> 10 the fascine is covered with 6 inches of soil, the soil covering the fascine shall be <br /> thoroughly watered. <br /> Ill <br /> 12 <br /> 13 When used to remedy erosion areas. live fascines shall extend a minimum of <br /> 14 two feet beyond the visible area of erosion and soil disturbance. The locations <br /> 15 for live fascines and live stake rows shall be identified in the field for review and <br /> 16 acceptance by the Engineer. The Engineer may require adjustment of fascine <br /> 17 locations prior to installation in order to best accomplish the intended functions. <br /> I 18 <br /> 19 Plant replacement during plant establishment for "PSIPE Live Fascine" will be <br /> 20 required for any section void of live shoots for a length of 3 feet or more. <br /> 21 Replacement shall consist of installing live stakes, spaced 1 foot apart above the <br /> I 22 fascine within the area void of live shoots. Live stakes shall be of the same <br /> 23 species as the live fascine and shall have a minimum length of 3 feet and a <br /> 24 minimum diameter of 3/ inch. The requirements of Section 8-02.3(8) apply to <br /> 25 PSIPE Live Fascine. <br /> 26 <br /> 27 8-02.3(15)B Brush Mattress <br /> 28 Live brush mattress shall be constructed of live branch cuttings, live poles, jute <br /> 29 rope and topsoil. The live cuttings and live poles shall be from the plant species <br /> 30 designated in the Plans. Live branch cuttings shall be placed with the cut ends <br /> 31 oriented down slope as shown in the Plans. Cuttings shall overlap from side to <br /> I32 side and from top to bottom as each layer is constructed. The live branches in <br /> 33 each succeeding upper layer shall overlap the adjacent lower layer by a <br /> 34 minimum of 6 inches. A maximum of 20 percent of the branches may be dead <br /> I 35 branches, but the live branches shall be distributed evenly to provide even <br /> 36 rooting and growth over the entire area of the brush mattress. <br /> 37 <br /> I 38 The Contractor shall anchor the live brush mattress to the slope using stakes <br /> 39 and jute rope as shown in the Plans. Initially, the stakes shall be installed to <br /> 40 protrude above the live brush mattress. The Contractor shall attach the jute rope <br /> 41 to the stakes and tighten the rope by tamping the stakes further into the bank, <br /> I 42 pulling the live brush mattress tight against the soil surface. The Contractor shall <br /> 43 cover the live brush mattress with sufficient stockpiled topsoil to ensure good soil <br /> 44 contact with the live plant material. <br /> I <br /> 45 <br /> 46 Plant replacement during plant establishment for "PSIPE Live Brush Mattress" <br /> 47 will be required for any section void of live shoots for an area of 25 square feet <br /> I 48 or more. Replacement shall consist of installing live stakes, spaced 3 feet apart <br /> 49 in a triangular pattern within the area void of live shoots. Live stakes shall be of <br /> 50 the same species as the live brush mattress and shall have a minimum length of <br /> 51 3 feet and a minimum diameter of 3/ inch. The requirements of Section 8-02.3(8) <br /> I <br /> 52 apply to PSIPE Brush Mattress. <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.