My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 2. Cutting or trimming vegetation within drainage channels to maintain <br /> 3 positive flow. <br /> 4 <br /> 5 3. Remove dirt and debris from inside of culverts or any drainage area <br /> 6 where runoff has allowed accumulations and re-seed for erosion <br /> 7 control. <br /> i 8 <br /> 9 4. Restore channels to previous operational condition. <br /> 10 <br /> I <br /> 11 <br /> 12 8-02.4 Measurement <br /> Topsoil, bark or woodchip mulch and soil amendments will be measured by the acre or <br /> 13 the square yard along the grade and slope of the area covered immediately after <br /> 14 placement. Weed control pre-treatment of topsoil areas, excavation, and stockpiling are <br /> 15 included in the bid item "Topsoil Type_. <br /> 16 <br /> 17 Bark or woodchip mulch rings will be measured per each. <br /> I 18 <br /> 19 Compost will be measured by the acre or the square yard along the grade and slope of <br /> 20 the area covered immediately after application. <br /> 21 <br /> 22 Seeding, fertilizing, and mulching will be measured by the acre or the square yard by <br /> 23 ground slope measurement or through the use of design data. <br /> 24 <br /> ' 25 Seeding and fertilizing by hand will be measured by the square yard. No adjustment in <br /> 26 area size will be made for the vegetation free zone around each plant. <br /> 27 <br /> 28 Seeded lawn, sod installation, and lawn mowing will be measured along the ground slope <br /> 29 and computed in square yards of actual lawn completed, established. and accepted. <br /> 30 <br /> 1 31 Plant selection will be measured per each. <br /> 32 <br /> 33 PSIPE _ (Plant Selection Including Plant Establishment) will be measured per each. <br /> 34 <br /> 35 Live Pole will be measured per each. <br /> 36 <br /> 37 Live Stake Row will be measured by the linear foot along the ground slope line. <br /> I 38 <br /> 39 The pay quantities for plant materials will be determined by count of the number of <br /> 40 satisfactory plants in each category accepted by the Engineer. <br /> i 41 <br /> 42 Fascine and PSIPE live fascine will be measured by the linear foot along the ground slope <br /> 43 line. <br /> 44 <br /> I <br /> 45 Brush mattress and PSIPE live brush mattress will be measured by the surface square <br /> 46 yard along the ground slope line. <br /> 47 <br /> 48 Brush layer and PSIPE brush layer will be measured by the linear foot along the ground <br /> 49 slope line. <br /> 50 <br /> I <br /> 51 <br /> 52 Water will be measured in accordance with Section 2-07.4. Measurement will be made of <br /> only that water hauled in tank trucks or similar equipment. <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> ISTATE FUND#HLP PB17(014); COE#PW3688 Page AM-103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.