My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2 8-02.5 Payment <br /> I <br /> 3 Payment will be made for each of the following listed Bid items that are included in the <br /> 4 Proposal: 1 5 <br /> 6 "Project Area Weed and Pest Control"will be paid in accordance with Section 1-09.6. <br /> 7 For the purpose of providing a common Proposal for all Bidders, the Contracting <br /> 8 Agency entered an amount for"Project Area Weed and Pest Control" in the Proposal <br /> 9 to become a part of the total Bid by the Contractor. Payment under this item will be <br /> 10 made only when the Work is not already covered by other items. <br /> 11 <br /> I <br /> 12 "Topsoil Type ", per acre. <br /> 13 The unit Contract price per acre for "Topsoil Type " shall be full payment for all <br /> 14 costs for the specified Work. <br /> 15 <br /> 16 "Fine Compost ", per acre or per square yard. <br /> 17 "Medium Compost", per acre or per square yard. <br /> 18 "Coarse Compost", per acre or per square yard. <br /> 19 The unit Contract price per acre for "Fine Compost", "Medium Compost" or "Coarse <br /> 20 Compost" shall be full pay for furnishing and spreading the compost onto the existing <br /> 21 soil. <br /> 22 <br /> 23 "Soil Amendment", per acre. <br /> 24 The unit Contract price per acre for "Soil Amendment" shall be full pay for furnishing <br /> I <br /> 25 and incorporating the soil amendment into the existing soil. <br /> 26 <br /> 27 "Plant Selection ", per each. <br /> 28 The unit Contract price for"Plant Selection ", per each shall be full pay for all Work <br /> 29 to perform the work as specified within the planting area prior to planting for weed <br /> 30 control, planting area preparation and installation of plants with initial watering. <br /> 31 I 32 As the plants that do not include plant establishment are obtained, propagated, and <br /> 33 grown, partial payments will be made as follows: <br /> 34 <br /> I <br /> 35 Payment of 15 percent of the unit Contract price per each when the plant <br /> 36 materials have been contracted, propagated, and are growing under nursery <br /> 37 conditions. The Contractor shall provide the Engineer with certification that the <br /> 38 plant material has been procured or contracted for delivery to the project for <br /> 39 planting within the time limits of the project. The certification shall state the <br /> 40 location, quantity, and size of all material. <br /> 41 I 42 Payment will be increased to 100 percent of the unit Contract price per each for <br /> 43 contracted plant material at the completion of the initial planting. <br /> 44 <br /> I <br /> 45 All partial payments shall be limited to the actual number of healthy vigorous <br /> 46 plants that meet the stage requirements, limited to plan quantity. Previous partial <br /> 47 payments made for materials rejected or missing will be deducted from future <br /> 48 payments due the Contractor. I <br /> 49 <br /> 50 "PSIPE ", per each. <br /> 51 The unit Contract price for "PSIPE ", per each, shall be full pay for all Work I 52 necessary to perform as specified within the planting area for weed control and <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PBI7(014); COE#PW3688 Page AM-104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.