My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Roundabout truck apron cement concrete curb and gutter shall be constructed with air <br /> 2 entrained concrete Class 4000 conforming to the requirements of Section 6-02. <br /> 3 <br /> 4 8-06.AP8 <br /> I 5 Section 8-06, Cement Concrete Driveway Entrances <br /> 6 April 2, 2018 <br /> I 7 8-06.2 Materials <br /> 8 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 9 <br /> I <br /> 10 <br /> 11 Cement 9-01 <br /> 12 8-06.3 Construction Requirements <br /> I 13 The first paragraph is revised to read: <br /> 14 <br /> 15 Cement concrete driveway approaches shall be constructed with air entrained concrete <br /> 16 Class 4000 conforming to the requirements of Section 6-02 or Portland Cement or <br /> I17 Blended Hydraulic Cement Concrete Pavement conforming to the requirements of Section <br /> 18 5-05. <br /> 19 <br /> I 20 8-07.AP8 <br /> 21 Section 8-07, Precast Traffic Curb <br /> 22 April 2, 2018 <br /> 23 8-07.3(1) Installing Curbs <br /> 24 The first sentence of the first paragraph is revised to read: <br /> 25 <br /> I 26 The curb shall be firmly bedded for its entire length and breadth on a mortar bed <br /> 27 conforming to Section 9-20.4(3) composed of one part Portland cement or blended <br /> 28 hydraulic cement and two parts sand. <br /> I 29 <br /> 30 The fourth paragraph is revised to read: <br /> 31 <br /> I <br /> 32 <br /> 33 All joints between adjacent pieces of curb except joints for expansion and/or drainage as <br /> designated by the Engineer shall be filled with mortar composed of one part Portland <br /> 34 cement or blended hydraulic cement and two parts sand. <br /> I <br /> 00 <br /> 36 8-09.AP8 <br /> 37 Section 8-09, Raised Pavement Markers <br /> 38 April 1, 2019 <br /> I39 8-09.5 Payment <br /> 40 The last paragraph is revised to read: <br /> I 41 <br /> 42 The unit Contract price per hundred for "Raised Pavement Marker Type 1", "Raised <br /> 43 Pavement Marker Type 2", "Raised Pavement Marker Type 3 In.", and "Recessed <br /> I 44 Pavement Marker" shall be full pay for furnishing and installing the markers in accordance <br /> 45 with these Specifications. <br /> 46 <br /> I <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> 1 STATE FUND#1-ILP PB17(014); COE#PW3688 Page AM-107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.