My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 all labor, tools, equipment, and materials necessary to complete the Work as specified 1112 and shall be paid in the following sequence for healthy, vigorous lawn: <br /> 3 <br /> 4 Completion of Lawn Planting 60 percent of individual areas <br /> 5111 6 Mid Lawn Establishment (after two mowings) 85 percent of individual areas <br /> 7 <br /> 8 Completion of Lawn Establishment 100 percent of individual areas <br /> 9 (after four mowings) <br /> 10 <br /> 11 "Plant Establishment Year " will be paid in accordance with Section 1-09.6. <br /> 12 For the purpose of providing a common Proposal for all Bidders, the Contracting <br /> 13 Agency entered an amount for "Plant Establishment - Year" in the Proposal to <br /> 14 become a part of the total Bid by the Contractor. <br /> 15 <br /> 16 "Live Pole", per each. <br /> 17 <br /> 18 "Live Stake Row", per linear foot. <br /> 19 111 <br /> 20 "Bark or Wood Chip Mulch", per acre. <br /> 21 <br /> 22 "Bark or Wood Chip Mulch Rings", per each. <br /> 23 The unit Contract price per acre for "Bark or Wood Chip Mulch" shall be full pay for <br /> 24 furnishing and spreading the mulch onto the existing soil. <br /> 25 <br /> 26 "Fascine" and "PSIPE Live Fascine", per linear foot. <br /> 27 "Brush Mattress" and "PSIPE Live Brush Mattress", per square yard. <br /> 28 "Brush Layer" and "PSIPE Brush Layer", per linear foot. <br /> 29 When PSIPE is included with Fascine, Brush Mattress, or Brush Layer, the payment <br /> 30 schedule for PSIPE will apply. <br /> 31 <br /> 32 "Roadside Maintenance under Construction" will be paid in accordance with Section <br /> 33 1-09.6. <br /> 34 For the purpose of providing a common Proposal for all Bidders, the Contracting <br /> 35 Agency has entered an amount for "Roadside Maintenance Under Construction" in <br /> 36 the Proposal to become a part of the total Bid by the Contractor. <br /> 37 <br /> 38 "Water', per M Gal. <br /> 39 <br /> 40 <br /> 41 8-04.AP8 <br /> 42 Section 8-04, Curbs, Gutters, and Spillways <br /> 43 April 2, 2018 <br /> 44 8-04.2 Materials ' <br /> 45 In the first paragraph. the reference to "Portland Cement" is revised to read: <br /> 46 <br /> 47 Cement 9-01 <br /> 48 <br /> 49 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> 50 The first paragraph is supplemented with the following: <br /> 51 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#1-ILP PB17(014); COE#PW3688 Page AM-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.