My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 Welded wire manufacturers shall participate in the NTPEP Audit Program for Reinforcing <br /> 3 Steel (rebar) Manufacturers and shall be listed on the NTPEP audit program website <br /> 4 displaying that they are NTPEP compliant. <br /> 15 <br /> 6 9-08.AP9 <br /> 7 Section 9-08, Paints and Related Materials <br /> 8 January 7, 2019 <br /> 9 9-08.1(1) Description <br /> I 10 The first sentence is revised to read: <br /> 11 <br /> 12 Paint used for highway and bridge structure applications shall be made from materials <br /> I 13 <br /> 14 meeting the requirements of the applicable Federal and State Paint Specifications, <br /> Department of Defense (DOD),American Society of Testing of Materials (ASTM), and The <br /> 15 Society for Protective Coatings (SSPC) specifications in effect at time of manufacture. <br /> 16 <br /> I 17 9-08.1(2) Paint Types <br /> 18 This section is supplemented with the following new subsections: <br /> 19 <br /> I <br /> 20 <br /> 21 9-08.1(2)M NEPCOAT Qualified Products List A <br /> Qualified products used shall be part of a NEPCOAT system supplied by the same <br /> 22 manufacturer. <br /> I 23 <br /> 24 9-08.1(2)N NEPCOAT Qualified Products List B <br /> 25 Qualified products used shall be part of a NEPCOAT system supplied by the same <br /> 26 manufacturer. <br /> I 27 <br /> 28 9-08.1(2)D Organic Zinc-Rich Primer <br /> 29 This section, including title, is revised to read: <br /> I 30 <br /> 31 Vacant <br /> 32 <br /> I 33 9-08.1(2)E Epoxy Polyamide <br /> 34 This section is revised to read: <br /> 35 <br /> I <br /> 36 <br /> 37 Epoxy polyamide shall be a two-component system conforming to MIL-DTL-24441 or <br /> SSPC Coating Standard No. 42. <br /> 38 <br /> I 39 9-08.1(2)H Top Coat, Single-Component, Moisture-Cured Polyurethane <br /> 40 This section is revised to read: <br /> 41 <br /> 42 Vehicle Type: Moisture-cured aliphatic polyurethane. <br /> I 43 <br /> 44 Color and Gloss: Meet the SAE AMS Standard 595 Color as specified in the table <br /> 45 below. <br /> I 46 <br /> 47 The Top Coat shall meet the following requirements: <br /> 48 <br /> I 49 The resin shall be an aliphatic urethane. <br /> 50 <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> ISTATE FUND#HLP PB17(014); COE#PW3688 Page AM-123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.