My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> • 1 <br /> 2 Poured Portland Cement or Blended Hydraulic Cement Concrete Slope <br /> Protection <br /> 3 <br /> 4 9-13.5(3) Pneumatically Placed Portland Cement Concrete Slope Protection <br /> 5 This section's title is revised to read: <br /> 6 <br /> 7 Pneumatically Placed Portland Cement or Blended Hydraulic Cement <br /> 111 8 Concrete Slope Protection <br /> 9 <br /> 10 The first paragraph is revised to read: <br /> ' 11 <br /> 12 Cement—This material shall be portland cement or blended hydraulic cement as specified <br /> 13 in Section 9-01. <br /> 14 <br /> 15 9-13.7(1) Rock for Rock Walls and Chinking Material <br /> 16 The first paragraph (up until the colon) is revised to read: <br /> 17 <br /> 18 Rock for rock walls and chinking material shall be hard, sound and durable material, <br /> 19 free from seams, cracks, and other defects tending to destroy its resistance to weather. <br /> 20 and shall meet the following test requirements: <br /> I 21 <br /> 22 9-14.AP9 <br /> 23 Section 9-14, Erosion Control and Roadside Planting <br /> 24 August 6, 2018 <br /> 25 9-14A(2) Hydraulically Applied Erosion Control Products (HECPs) <br /> 26 In Table 1, the last four rows are deleted. <br /> 27 <br /> 28 9-14.4(2)A Long-Term Mulch <br /> 29 The first paragraph is supplemented with the following: <br /> 30 <br /> 31 Products containing cellulose fiber produced from paper or paper components will not be <br /> 32 accepted. <br /> 33 <br /> 34 Table 2 is supplemented with the following new rows: <br /> 35 <br /> L Water Holding Capacity ASTM D 7367 800 percent minimum <br /> Organic Matter Content AASHTO T 267 90 percent minimum <br /> Seed Germination ASTM D 7322 Long Term <br /> I Enhancement 420 percent minimum <br /> 36 <br /> 37 <br /> 38 9-14.4(2)B Moderate-Term Mulch <br /> 39 This section is revised to read: <br /> 40 <br /> 41 Within 48 hours of application, the Moderate-Term Mulch shall bond with the soil surface <br /> 42 to create a continuous, absorbent, flexible, erosion-resistant blanket. Moderate-Term <br /> 43 Mulch shall effectively perform the intended erosion control function in accordance with <br /> 44 Section 8-01.3(1) for a minimum of 3 months, or until temporary vegetation has been <br /> 45 established, whichever comes first. <br /> 46 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.