My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 Moderate-Term Mulch shall not be used in conjunction with permanent seeding. <br /> 2 <br /> 3 9-14.4(2)C Short-Term Mulch <br /> 4 This section is revised to read: <br /> 5 <br /> 6 Short-Term Mulch shall effectively perform the intended erosion control function in <br /> 7 accordance with Section 8-01.3(1) for a minimum of 2 months, or until temporary <br /> 8 vegetation has been established, whichever comes first. Short-Term Mulch shall not be <br /> 9 used in conjunction with permanent seeding. <br /> 10 <br /> 11 9-16.AP9 <br /> 12 Section 9-16, Fence and Guardrail <br /> 13 August 6, 2018 <br /> 14 9-16.3(1) Rail Element , <br /> 15 The last sentence of the first paragraph is revised to read: <br /> 16 <br /> 17 All rail elements shall be formed from 12-gage steel except for thrie beam reducer <br /> 18 sections, reduced length thrie beam rail elements,thrie beams used for bridge rail retrofits, <br /> 19 and Design F end sections, which shall be formed from 10-gage steel. <br /> 20 <br /> 21 9-16.3(5) Anchors <br /> 22 The last paragraph is revised to read: <br /> 23 <br /> 24 Cement grout shall conform to Section 9-20.3(4) and consist of one part portland cement <br /> 25 or blended hydraulic cement and two parts sand. <br /> 26 <br /> 27 9-18.AP9 <br /> 28 Section 9-18, Precast Traffic Curb <br /> 29 April 2, 2018 <br /> 30 9-18.1(1) Aggregates and Proportioning <br /> 31 Item number 1 of the first paragraph is revised to read: <br /> 32 <br /> 33 1. Portland cement or blended hydraulic cement shall conform to the requirements of <br /> 34 Section 9-01 except that it may be Type I portland cement conforming to AASHTO M <br /> 35 85. <br /> 36 <br /> 37 9-20.AP9 <br /> 38 Section 9-20, Concrete Patching Material, Grout, and Mortar <br /> 39 April 1, 2019 t <br /> 40 9-20.1 Patching Material <br /> 41 This section, including title, is revised to read: <br /> 42 <br /> 43 9-20.1 Patching Material for Cement Concrete Pavement <br /> 44 Concrete patching material shall be prepackaged mortar extended with aggregate. The <br /> 45 amount of aggregate for extension shall conform to the manufacturer's recommendation. <br /> 46 <br /> 47 Patching mortar and patching mortar extended with aggregate shall contain cementitious <br /> 48 material and conform to Sections 9-20.1(1) and 9-20.1(2). The Manufacturer shall use the <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.