My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 1 <br /> 2 services of a laboratory that has an equipment calibration verification system and a <br /> technician training and evaluation process in accordance with AASHTO R 18 to perform <br /> 3 all tests specified in Section 9-20.1. <br /> 4 <br /> I 5 9-20.1(1) Patching Mortar <br /> 6 Patching mortar shall conform to the following requirements: <br /> 7 <br /> 1 Compressive <br /> Strength ASTM Test Method f Specification <br /> at 3 hours I C 39 , Minimum 3,000 psi <br /> I at 24 hours 39 Minimum 5,000 psi <br /> Length Change <br /> at 28 days � C 157 0.15 percent maximum <br /> I Total Chloride Ion C 1218 1 lb/yd3 maximum <br /> Content <br /> Bond Strength <br /> at 24 hours C 882 (As modified by Minimum 1,000 psi <br /> I C 928, Section 9.5) <br /> Scaling Resistance (at C 672 (As modified by 1 lb/ft2 maximum <br /> 25 cycles of freezing C 928, Section 9.4) <br /> I and thawing) I <br /> 8 <br /> 9 9-20.1(2) Patching Mortar Extended with Aggregate <br /> I 10 Patching mortar extended with aggregate shall meet the following requirements: <br /> 11 <br /> Compressive ASTM Test Method Specification <br /> Strength <br /> I at 3 hours C 39 Minimum 3,000 psi <br /> at 24 hours C 39 Minimum 5,000 psi <br /> Length Change <br /> I at 28 days C 157 0.15 percent maximum <br /> Bond Strength <br /> at 24 hours C 882 (As modified by Minimum 1,000 psi <br /> I ASTM C928, Section <br /> 9.5) <br /> Scaling Resistance (at C 672 2 Maximum Visual <br /> I ' 25 cycles of freezing Rating <br /> and thawing) <br /> Freeze thaw C 666 Maximum expansion <br /> 0.10% <br /> II Minimum durability <br /> 90.0% <br /> 12 <br /> I 13 9-20.1(3) Aggregate <br /> 14 Aggregate used to extend the patching mortar shall conform to Section 9-03.1(4) and <br /> 15 be AASHTO Grading No. 8. A Manufacturer's Certificate of Compliance shall be <br /> I 16 submitted showing the aggregate source and the gradation. Mitigation for Alkali Silica <br /> 17 Reaction (ASR) will not be required for the extender aggregate used for concrete <br /> 18 patching material. <br /> 19 <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> I <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.