My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 2-01 Clearing, Grubbing, and Roadside Cleanup SP-48 <br /> 2-01.1 Description SP-48 <br /> I 2-01.5 Payment SP-48 <br /> 2-02 Removal of Structures and Obstructions SP-49 <br /> I 2-02.5 Payment SP-50 <br /> 2-03 Roadway Excavation and Embankment SP-51 <br /> 2-03.4 Measurement SP-51 <br /> IDIVISION 4: Bases SP-52 <br /> 4-04 Ballast and Crushed Surfacing SP-52 <br /> 1 4-04.1 Description SP-52 <br /> DIVISION 5:Surface Treatments and Pavements SP-53 <br /> I 5-04 Hot Mix Asphalt SP-53 <br /> 5-04.1 Description SP-53 <br /> 5-04.2 Materials SP-53 <br /> I5-04.3 Construction Requirements SP-55 <br /> 5-04.4 Measurement SP-81 <br /> 1 5-04.5 Payment SP-82 <br /> 5-06 PAVEMENT PATCHING SP-84 <br /> I5-06.1 Description SP-84 <br /> 5-06.2 Materials SP-84 <br /> I 5-06.3 Construction Requirements SP-85 <br /> 5-06.4 Measurement SP-87 <br /> 5-06.5 Payment SP-87 <br /> IDIVISION 7: Drainage Structures, Storm Sewers,Sanitary Sewers, Water Mains, and Conduits SP-89 <br /> 7-05 Manholes, Inlets, Catch Basins, and Drywells SP-89 <br /> 1 7-05.3 Construction Requirements SP-89 <br /> 7-12 VALVES FOR WATER MAINS SP-89 <br /> 1 7-12.2 Materials SP-90 <br /> 7-12.3 Construction Requirements SP-90 <br /> 7-12.4 Measurement SP-91 <br /> I <br /> 7-12.5 Payment SP-91 <br /> 7-20 WATER METER BOX SP-92 <br /> 1 7-20.1 Description SP-92 <br /> 7-20.2 Materials SP-92 <br /> 1 7-20.3 Construction Requirements SP-92 <br /> iCITY OF EVERETT SPECIAL PROVISIONS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014);COE WO#PW3688 Page SP-iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.