My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 7-20.4 Measurement SP-92 i <br /> 7-20.5 Payment SP-92 <br /> DIVISION 8: Miscellaneous Construction SP-93 1 <br /> 8-01 Erosion Control and Water Pollution Control SP-93 <br /> 8-01.3 Construction Requirements SP-93 <br /> 8-04 CURBS, GUTTERS, AND SPILLWAYS SP-93 <br /> 8-04.1 Description SP-94 <br /> 8-04.3 Construction Requirements SP-94 <br /> 8-04.5 Payment SP-94 <br /> 8-06 CEMENT CONCRETE DRIVEWAY RAMP SP-95 <br /> I <br /> 8-06.3 Construction Requirements SP-95 <br /> 8-06.4 Measurement SP-96 I <br /> 8-06.5 Payment SP-96 <br /> 8-13 MONUMENT CASES SP-96 <br /> 8-13.1 Description SP-96 <br /> 8-13.3 Construction Requirements SP-96 <br /> 8-13.4 Measurement SP-97 <br /> 8-13.5 Payment SP-97 <br /> 8-14 Cement Concrete Sidewalks SP-98 I <br /> 8-14.1 Description SP-98 <br /> 8-14.3 Construction Requirements SP-98 <br /> 8-14.4 Measurement SP-100 <br /> 8-14.5 Payment SP-100 <br /> 8-20 Illumination,Traffic Signal Systems, Intelligent Transportation Systems, and <br /> Electrical SP-101 <br /> 8-20.2 Materials SP-101 <br /> I <br /> 8-20.3 Construction Requirements SP-113 <br /> 8-20.4 Measurement SP-122 1118-20.5 Payment SP-122 <br /> 8-22 PAVEMENT MARKING SP-122 <br /> 8-22.2 Materials SP-122 <br /> I <br /> 8-22.3 Construction Requirements SP-122 <br /> 8-22.4 Measurement SP-123 I <br /> 8-22.5 Payment SP-123 <br /> 8-26 CEMENT CONCRETE MODULAR BLOCK UNIT RETAINING WALL SP-123 <br /> CITY OF EVERETT SPECIAL PROVISIONS II <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE WO#PW3688 Page SP-iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.