Laserfiche WebLink
I <br /> I <br /> TABLE OF CONTENTS <br /> IAMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> IINTRODUCTION AM-i <br /> AMENDMENTS TO THE STANDARD SPECIFICATIONS AM-1 <br /> I Section 1-02, Bid Procedures and Conditions AM-1 <br /> Section 1 03, Award and Execution of Contract AM-2 <br /> Section 1-05, Control of Work AM-2 <br /> ISection 1-06, Control of Material AM-3 <br /> Section 1-07, Legal Relations and Responsibilities to the Public AM-5 <br /> 1 Section 1-08, Prosecution and Progress AM-9 <br /> Section 1-09, Measurement and Payment AM-10 <br /> ISection 2-01, Clearing, Grubbing, and Roadside Cleanup AM-11 <br /> Section 2-02, Removal of Structures and Obstructions AM-11 <br /> ISection 2-03, Roadway Excavation and Embankment AM-11 <br /> Section 2-09, Structure Excavation AM-11 <br /> ISection 3-01, Production from Quarry and Pit Sites AM-13 <br /> Section 4-04, Ballast and Crushed Surfacing AM-13 <br /> I Section 5-01, Cement Concrete Pavement Rehabilitation AM-13 <br /> Section 5 02, Bituminous Surface Treatment AM-19 <br /> Section 5-04, Hot Mix Asphalt AM-19 <br /> ISection 5-05, Cement Concrete Pavement AM-23 <br /> Section 6-01, General Requirements for Structures AM-31 <br /> ISection 6-02, Concrete Structures AM-34 <br /> Section 6-03, Steel Structures AM-42 <br /> ISection 6-05, Piling AM-42 <br /> Section 6-07, Painting AM-43 <br /> ISection 6-08, Bituminous Surfacing on Structure Decks AM-58 <br /> Section 6-09, Modified Concrete Overlays AM-59 <br /> ISection 6-10, Concrete Barrier AM-63 <br /> Section 6-il, Reinforced Concrete Walls AM-63 <br /> I Section 6-12, Noise Barrier Walls AM-64 <br /> Section 6 13, Structural Earth Walls AM-64 <br /> 111 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014);COE#PW3688 Page AM-i <br />