My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> Section 6-14, Geosynthetic Retaining Walls AM-65 <br /> Section 6-15, Soil Nail Walls AM-65 1 <br /> Section 6-16, Soldier Pile and Soldier Pile Tieback Walls AM-65 <br /> Section 6-18, Shotcrete Facing AM-65 1 <br /> Section 6-19, Shafts AM-66 <br /> Section 7-02, Culverts AM-67 I <br /> Section 7-05, Manholes, Inlets, Catch Basins, and Drywells AM-67 <br /> Section 7-08, General Pipe Installation Requirements AM-67 <br /> Section 8-01, Erosion Control and Water Pollution Control AM-67 <br /> Section 8-02, Roadside Restoration AM-84 <br /> Section 8-04, Curbs, Gutters, and Spillways AM-106 <br /> Section 8-06, Cement Concrete Driveway Entrances AM-107 I Section 8-07, Precast Traffic Curb AM-107 <br /> Section 8-09, Raised Pavement Markers AM-107 <br /> Section 8-11, Guardrail AM-108 I <br /> Section 8-14, Cement Concrete Sidewalks AM-109 <br /> Section 8-16, Concrete Slope Protection AM-109 I <br /> Section 8-17, Impact Attenuator Systems AM-109 <br /> Section 8-20, Illumination,Traffic Signal Systems, Intelligent Transportation Systems, and Electrical I <br /> AM-109 <br /> Section 8-21, Permanent Signing AM 110 <br /> Section 8-22, Pavement Marking AM-111 <br /> Section 9-00, Definitions and Tests AM 111 <br /> Section 9-02, Bituminous Materials AM-111 <br /> Section 9-03, Aggregates AM-113 <br /> Section 9-04,Joint and Crack Sealing Materials AM-118 <br /> Section 9-05, Drainage Structures and Culverts AM-118 <br /> Section 9-06, Structural Steel and Related Materials AM-119 I <br /> Section 9-07, Reinforcing Steel AM-121 <br /> Section 9-08, Paints and Related Materials AM-123 <br /> Section 9-13, Riprap, Quarry Spalls, Slope Protection, and Rock for Erosion and Scour Protection and <br /> Rock Walls AM-126 <br /> Section 9-14, Erosion Control and Roadside Planting AM-127 <br /> 111 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.