My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 INTRODUCTION TO THE SPECIAL PROVISIONS <br /> 3 (August 14, 2013 APWA GSP) <br /> 4 <br /> 5 The work on this project shall be accomplished in accordance with the Standard Specifications for Road, <br /> 6 Bridge and Municipal Construction, 2018 edition, as issued by the Washington State Department of <br /> 7 Transportation (WSDOT) and the American Public Works Association (APWA), Washington State <br /> 8 Chapter (hereafter "Standard Specifications"). The Standard Specifications, as modified or <br /> 9 supplemented by the Amendments to the Standard Specifications and these Special Provisions, all of <br /> 10 which are made a part of the Contract Documents, shall govern all of the Work. <br /> 11 <br /> 12 These Special Provisions are made up of both General Special Provisions (GSPs) from various sources, <br /> 13 which may have project-specific fill-ins; and project-specific Special Provisions. Each Provision either <br /> 14 supplements, modifies, or replaces the comparable Standard Specification, or is a new Provision. The <br /> 15 deletion, amendment, alteration, or addition to any subsection or portion of the Standard <br /> 16 Specifications is meant to pertain only to that particular portion of the section, and in no way should it <br /> 17 be interpreted that the balance of the section does not apply. <br /> 18 <br /> 19 The project-specific Special Provisions are not labeled as such. The GSPs are labeled under the headers <br /> 20 of each GSP,with the effective date of the GSP and its source. For example: <br /> 21 <br /> 22 (March 8, 2013 APWA GSP) <br /> 23 (April 1, 2013 WSDOT GSP) <br /> 24 <br /> 25 Also incorporated into the Contract Documents by reference are: <br /> 26 • Manual on Uniform Traffic Control Devices for Streets and Highways,currently adopted edition, <br /> 27 with Washington State modifications, if any <br /> 28 • Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, current edition <br /> 29 • City of Everett Design and Construction Standards and Specifications for Development <br /> 30 <br /> 31 Contractor shall obtain copies of these publications, at Contractor's own expense. <br /> I <br /> 1 <br /> I <br /> I <br /> 1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE WO#PW3688 Page SP-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.