My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 Contract Documents 111 <br /> 3 See definition for"Contract". <br /> 4 <br /> 5 Contract Time <br /> 6 The period of time established by the terms and conditions of the Contract within which the <br /> 7 Work must be physically completed. <br /> 8 <br /> 9 Notice of Award <br /> 10 The written notice from the Contracting Agency to the successful Bidder signifying the <br /> 11 Contracting Agency's acceptance of the Bid Proposal. <br /> 12 <br /> 13 Notice to Proceed <br /> 14 The written notice from the Contracting Agency or Engineer to the Contractor authorizing and <br /> 15 directing the Contractor to proceed with the Work and establishing the date on which the <br /> 16 Contract time begins. <br /> 17 <br /> 18 Traffic <br /> 19 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br /> 20 equestrian traffic. <br /> 21 <br /> 22 <br /> 23 1-02 BID PROCEDURES AND CONDITIONS <br /> 24 <br /> 25 1-02.1 Prequalification of Bidders <br /> 26 <br /> 27 Delete this section and replace it with the following: <br /> 28 <br /> 29 1-02.1 Qualifications of Bidder <br /> 111 <br /> 30 (January 24, 2011 APWA GSP) <br /> 31 <br /> 32 Before award of a public works contract, a bidder must meet at least the minimum qualifications <br /> 33 of RCW 39.04.350(1) to be considered a responsible bidder and qualified to be awarded a public <br /> 34 works project. <br /> 35 <br /> 36 <br /> 37 1-02.2 Plans and Specifications <br /> 38 (June 27, 2011 APWA GSP) <br /> 39 111 <br /> 40 Delete this section and replace it with the following: <br /> 41 <br /> 42 Information as to where Bid Documents can be obtained or reviewed can be found in the Call for <br /> 43 Bids (Advertisement for Bids)for the work. <br /> 44 <br /> 45 After award of the contract, plans and specifications will be issued to the Contractor at no cost as <br /> 46 detailed below: <br /> 47 <br /> To Prime Contractor No. of Sets Basis of Distribution <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PBI7(014);COE WO#PW3688 Page SP-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.