My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 1 <br /> 2 temporary substitute facilities, plant establishment periods, or correction or repair remains <br /> for the Physical Completion of the total Contract. <br /> 3 Physical Completion Date <br /> I 4 The day all of the Work is physically completed on the project. All documentation required <br /> 5 by the Contract and required by law does not necessarily need to be furnished by the <br /> 6 Contractor by this date. <br /> I 7 Completion Date <br /> 8 The day all the Work specified in the Contract is completed and all the obligations of the <br /> 9 Contractor under the contract are fulfilled by the Contractor. All documentation required by <br /> I 10 the Contract and required by law must be furnished by the Contractor before establishment <br /> 11 of this date. <br /> 12 Final Acceptance Date <br /> II 13 The date on which the Contracting Agency accepts the Work as complete. <br /> 14 <br /> 15 Supplement this Section with the following: <br /> I 16 <br /> 17 All references in the Standard Specifications, Amendments, or WSDOT General Special <br /> 18 Provisions,to the terms "Department of Transportation", "Washington State Transportation <br /> I 19 <br /> Commission„ "Secretary", "Headquarters",Commission", 'Secretary of Transportation', and <br /> 20 "State Treasurer" shall be revised to read "Contracting Agency". <br /> 21 <br /> I 22 All references to the terms "State" or"state” shall be revised to read "Contracting.Agency" <br /> 23 unless the reference is to an administrative agency of the State of Washington, a State statute or <br /> 24 regulation, or the context reasonably indicates otherwise. <br /> 25 <br /> I26 All references to "State Materials Laboratory" shall be revised to read "Contracting Agency <br /> 27 designated location". <br /> 00 <br /> LV <br /> II 29 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 30 Contracting Agency form(s) by which final payment is authorized, and final completion and <br /> 31 acceptance granted. <br /> I 32 <br /> 33 Additive <br /> 34 A supplemental unit of work or group of bid items, identified separately in the Bid Proposal, <br /> I 35 which may, at the discretion of the Contracting Agency, be awarded in addition to the base bid. <br /> 36 <br /> 37 Alternate <br /> I 38 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> 39 Proposal,from which the Contracting Agency may make a choice between different methods or <br /> 40 material of construction for performing the same work. <br /> I 41 <br /> 42 Business Day <br /> 43 A business day is any day from Monday through Friday except holidays as listed in Section 1-08.5. <br /> I 44 <br /> 45 Contract Bond <br /> 46 The definition in the Standard Specifications for"Contract Bond" applies to whatever bond <br /> 47 form(s) are required by the Contract Documents, which may be a combination of a Payment <br /> I48 Bond and a Performance Bond. <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/1212019 <br /> 111 <br /> STATE FUND#1-ILP PB17(014);COE WO#PW3688 Page SP-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.