Laserfiche WebLink
I <br /> I 1 <br /> 2 temporary substitute facilities, plant establishment periods, or correction or repair remains <br /> for the Physical Completion of the total Contract. <br /> 3 Physical Completion Date <br /> I 4 The day all of the Work is physically completed on the project. All documentation required <br /> 5 by the Contract and required by law does not necessarily need to be furnished by the <br /> 6 Contractor by this date. <br /> I 7 Completion Date <br /> 8 The day all the Work specified in the Contract is completed and all the obligations of the <br /> 9 Contractor under the contract are fulfilled by the Contractor. All documentation required by <br /> I 10 the Contract and required by law must be furnished by the Contractor before establishment <br /> 11 of this date. <br /> 12 Final Acceptance Date <br /> II 13 The date on which the Contracting Agency accepts the Work as complete. <br /> 14 <br /> 15 Supplement this Section with the following: <br /> I 16 <br /> 17 All references in the Standard Specifications, Amendments, or WSDOT General Special <br /> 18 Provisions,to the terms "Department of Transportation", "Washington State Transportation <br /> I 19 <br /> Commission„ "Secretary", "Headquarters",Commission", 'Secretary of Transportation', and <br /> 20 "State Treasurer" shall be revised to read "Contracting Agency". <br /> 21 <br /> I 22 All references to the terms "State" or"state” shall be revised to read "Contracting.Agency" <br /> 23 unless the reference is to an administrative agency of the State of Washington, a State statute or <br /> 24 regulation, or the context reasonably indicates otherwise. <br /> 25 <br /> I26 All references to "State Materials Laboratory" shall be revised to read "Contracting Agency <br /> 27 designated location". <br /> 00 <br /> LV <br /> II 29 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 30 Contracting Agency form(s) by which final payment is authorized, and final completion and <br /> 31 acceptance granted. <br /> I 32 <br /> 33 Additive <br /> 34 A supplemental unit of work or group of bid items, identified separately in the Bid Proposal, <br /> I 35 which may, at the discretion of the Contracting Agency, be awarded in addition to the base bid. <br /> 36 <br /> 37 Alternate <br /> I 38 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> 39 Proposal,from which the Contracting Agency may make a choice between different methods or <br /> 40 material of construction for performing the same work. <br /> I 41 <br /> 42 Business Day <br /> 43 A business day is any day from Monday through Friday except holidays as listed in Section 1-08.5. <br /> I 44 <br /> 45 Contract Bond <br /> 46 The definition in the Standard Specifications for"Contract Bond" applies to whatever bond <br /> 47 form(s) are required by the Contract Documents, which may be a combination of a Payment <br /> I48 Bond and a Performance Bond. <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/1212019 <br /> 111 <br /> STATE FUND#1-ILP PB17(014);COE WO#PW3688 Page SP-3 <br />