My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 percentages are also exactly equal,then the tie-breaker will be determined by drawing as <br /> 2 follows:Two or more slips of paper will be marked as follows: one marked "Winner" and the <br /> 3 other(s) marked "unsuccessful".The slips will be folded to make the marking unseen. The slips <br /> 4 will be placed inside a box. One authorized representative of each Bidder shall draw a slip from <br /> 5 the box. Bidders shall draw in alphabetic order by the name of the firm as registered with the <br /> 6 Washington State Department of Licensing.The slips shall be unfolded and the firm with the slip <br /> 7 marked "Winner"will be determined to be the successful Bidder and eligible for Award of the <br /> 8 Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> 9 responsive Bid, and with a proposed recycled m aterials percentage that is exactly equal to the <br /> 10 highest proposed recycled materials amount, are eligible to draw. <br /> I 11 <br /> 12 1-03.3 Execution of Contract <br /> 13 (October 1, 2005 APWA GSP) <br /> I <br /> 14 <br /> 15 Revise this section to read: <br /> 16 <br /> 17 Copies of the Contract Provisions, including the unsigned Form of Contract, will be available for <br /> 18 signature by the successful bidder on the first business day following award.The number of <br /> 19 copies to be executed by the Contractor will be determined by the Contracting Agency. <br /> 20 <br /> 21 Within 14 calendar days after the award date,the successful bidder shall return the <br /> 22 signed Contracting Agency-prepared contract, an insurance certification as required by Section 1- <br /> ' 23 07.18, and a satisfactory bond as required by law and Section 1-03.4. Before execution of the <br /> 24 contract by the Contracting Agency, the successful bidder shall provide any pre-award <br /> 25 information the Contracting Agency may require under Section 1-02.15. <br /> 26 <br /> 27 Until the Contracting Agency executes a contract, no proposal shall bind the Contracting Agency <br /> 28 nor shall any work begin within the project limits or within Contracting Agency-furnished sites. <br /> 29 The Contractor shall bear all risks for any work begun outside such areas and for any materials <br /> 30 ordered before the contract is executed by the Contracting Agency. <br /> 31 <br /> 32 If the bidder experiences circumstances beyond their control that prevents return of the contract <br /> 33 documents within the calendar days after the award date stated above,the Contracting Agency <br /> 34 may grant up to a maximum of 20 additional calendar days for return of the <br /> 35 documents, provider)the contracting Agency deems the circumstances warrant it. <br /> I 36 <br /> 37 <br /> 38 1-03.4 Contract Bond <br /> II 39 (July 23, 2015 APWA GSP) <br /> 40 <br /> 41 Delete the first paragraph and replace it with the following: <br /> I 42 <br /> 43 The successful bidder shall provide executed payment and performance bond(s)for the full <br /> 44 contract amount. The bond may be a combined payment and performance bond; or be separate <br /> 45 payment and performance bonds. In the case of separate payment and performance bonds, <br /> 46 each shall be for the full contract amount. The bond(s) shall: <br /> 47 1. Be on Contracting Agency-furnished form(s); <br /> I48 2. Be signed by an approved surety (or sureties)that: <br /> ICITY OF EVERETT SPECIAL PROVISIONS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014);COE WO#PW3688 Page SP-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.