My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 9-16, Fence and Guardrail AM-128 <br /> Section 9-18, Precast Traffic Curb AM-128 <br /> Section 9-20, Concrete Patching Material, Grout, and Mortar AM-128 <br /> Section 9-21, Raised Pavement Markers (RPM) AM-131 <br /> Section 9-23, Concrete Curing Materials and Admixtures AM-132 <br /> Section 9-26, Epoxy Resins AM-132 <br /> Section 9-28, Signing Materials and Fabrication AM-133 <br /> Section 9-29, Illumination, Signal, Electrical AM-134 <br /> Section 9 33, Construction Geosynthetic AM-140 <br /> 1 Section 9-34, Pavement Marking Material AM-141 <br /> I <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014);COE#PW3688 Page AM-iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.