My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 No Work shall occur within areas under the jurisdiction of resource agencies unless <br /> 3 authorized in the Contract. <br /> 4 <br /> 5 The third paragraph is deleted. <br /> 6 <br /> 7 1-07.5(2) State Department of Fish and Wildlife <br /> 8 This section is revised to read: <br /> 9 <br /> 10 In doing the Work, the Contractor shall: <br /> 11 <br /> 12 1. Not degrade water in a way that would harm fish, wildlife, or their habitat. <br /> 13 <br /> 14 2. Not place materials below or remove them from the ordinary high water line <br /> 15 except as may be specified in the Contract. <br /> 16 <br /> 17 3. Not allow equipment to enter waters of the State except as specified in the <br /> 18 Contract. <br /> 19 <br /> 20 4. Revegetate in accordance with the Plans, unless the Special Provisions permit <br /> 21 otherwise. <br /> 22 <br /> 23 5. Prevent any fish-threatening silt buildup on the bed or bottom of any body of <br /> 24 water. <br /> 25 <br /> 26 6. Ensure continuous stream flow downstream of the Work area. <br /> 27 <br /> 28 7. Dispose of any project debris by removal, burning, or placement above high- <br /> 29 water flows. <br /> 30 <br /> 31 8. Immediately notify the Engineer and stop all work causing impacts, if at any time, <br /> 32 as a result of project activities, fish are observed in distress or a fish kill occurs. <br /> 33 <br /> 34 If the Work in (1) through (3) above differs little from what the Contract requires, the <br /> 35 Contracting Agency will measure and pay for it at unit Contract prices. But if Contract items <br /> 36 do not cover those areas, the Contracting Agency will pay pursuant to Section 1-09.4. <br /> 37 Work in (4) through (8) above shall be incidental to Contract pay items. <br /> 38 v <br /> 39 1-07.5(3) State Department of Ecology <br /> 40 This section is revised to read: <br /> 41 <br /> 42 In doing the Work, the Contractor shall: <br /> 43 <br /> 44 1. Comply with Washington State Water Quality Standards. <br /> 45 <br /> 46 2. Perform Work in such a manner that all materials and substances not specifically <br /> 47 identified in the Contract documents to be placed in the water do not enter waters <br /> 48 of the State, including wetlands. These include, but are not limited to, petroleum <br /> 49 products, hydraulic fluid, fresh concrete, concrete wastewater, process <br /> 50 wastewater, slurry materials and waste from shaft drilling, sediments, sediment- <br /> 51 laden water, chemicals, paint, solvents, or other toxic or deleterious materials. <br /> 52 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#I-ILP PB17(014); COE#PW3688 Page AM-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.