Laserfiche WebLink
I <br /> 1 3. Use equipment that is free of external petroleum-based products. <br /> 2 <br /> 3 4. Remove accumulations of soil and debris from drive mechanisms (wheels, <br /> 4 tracks, tires) and undercarriage of equipment prior to using equipment below the <br /> I <br /> 5 ordinary high water line. <br /> 6 <br /> 7 5. Clean loose dirt and debris from all materials placed below the ordinary high <br /> I 8 water line. No materials shall be placed below the ordinary high water line without <br /> 9 the Engineer's concurrence. <br /> 10 <br /> 11 6. When a violation of the Construction Stormwater General Permit (CSWGP) <br /> 12 occurs, immediately notify the Engineer and fill out WSDOT Form 422-011, <br /> 13 Contractor ECAP Report, and submit the form to the Engineer within 48 hours of <br /> 14 the violation. <br /> I 15 <br /> 16 7. Once Physical Completion has been given, prepare a Notice of Termination <br /> 17 (Ecology Form ECY 020-87) and submit the Notice of Termination electronically <br /> I 18 to the Engineer in a PDF format a minimum of 7 calendar days prior to submitting <br /> 19 the Notice of Termination to Ecology. <br /> 20 <br /> I 21 8. Transfer the CSWGP coverage to the Contracting Agency when Physical <br /> 22 Completion has been given and the Engineer has determined that the project <br /> 23 site is not stabilized from erosion. <br /> 24 <br /> I <br /> 25 9. Submit copies of all correspondence with Ecology electronically to the Engineer <br /> 26 in a PDF format within four calendar days. <br /> 27 <br /> I 28 1-07.5(4) Air Quality <br /> 29 This section is revised to read: <br /> 30 <br /> I 31 The Contractor shall comply with all regional clean air authority and/or State Department <br /> 32 of Ecology rules and regulations. <br /> 33 <br /> 34 The air quality permit process may include additional State Environment Policy Act(SEPA) <br /> 35 requirements. Contractors shall contact the appropriate regional air pollution control <br /> 36 authority well in advance of beginning Work. <br /> 37 <br /> I 38 When the Work includes demolition or renovation of any existing facility or structure that <br /> 39 contains Asbestos Containing Material (ACM) and/or Presumed Asbestos-Containing <br /> 40 Material (PACM), the Contractor shall comply with the National Emission Standards for <br /> 141 Hazardous Air Pollutants (NESHAP). <br /> 42 <br /> 43 Any requirements included in Federal and State regulations regarding air quality that <br /> 44 applies to the "owner or operator" shall be the responsibility of the Contractor. <br /> I <br /> 45 <br /> 46 1-07.7(1) General <br /> 47 The first sentence of the third paragraph is revised to read: <br /> I 48 <br /> 49 When the Contractor moves equipment or materials on or over Structures, culverts or <br /> 50 pipes.the Contractor may operate equipment with only the load-limit restrictions in Section <br /> I 51 1-07.7(2). <br /> 52 <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> I <br /> STATE FUND#I-ILP PB17(014); COE#PW3688 Page AM-7 <br />