My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r _ <br /> EVERETT <br /> WASHINGTON <br /> i <br /> ADDENDUM NO. 1 <br /> ' TO THE PLANS,SPECIFICATIONS, PROPOSAL,AND CONTRACT <br /> FOR THE <br /> CITY OF EVERETT <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT <br /> STATE FUND#HLP P817(014);COE#PW3688 <br /> ISSUED THIS DATE: Thursday,August 22, 2019 <br /> BID OPENING: 2:00 pm (PDT)on <br /> i Tuesday,August 27, 2019 <br /> 2930 Wetmore Ave <br /> Everett, WA 98201 <br /> Addendum No. 1 shall be incorporated into the Contract Documents. <br /> Acknowledge receipt of this Addendum on the Proposal Signature Sheet(page PR-8). <br /> TO THE PROSPECTIVE BIDDERS: <br /> The attention of the prospective bidders on the above project is directed to the following additions and <br /> modifications to the contract documents. <br /> I. ADDITIONS, MODIFICATIONS,AND/OR DELETIONS TO THE CONTRACT DOCUMENTS AND <br /> SPECIFICATIONS <br /> ITEM NO. 1—SPECIAL PROVISIONS,SECTION 1-07.23,Public Convenience and Safety <br /> A. In section 1-07.23(3) Business Access, page SP-34, line numbers 28-31, replace the second <br /> and third paragraphs with the following: <br /> No single lane closures will be permitted weekdays between 2:30pm and 7:00pm,with no <br /> time restrictions on weekends for single lane closures. No two-lane closures will be <br /> permitted between 11:30am and 7:00 pm. Lane closures require a traffic control plan <br /> approved by the Engineer. <br /> No more than two-lane closures will be permitted. <br /> I <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.