Laserfiche WebLink
t <br /> ITEM NO. 2—SPECIAL PROVISIONS,SECTION 1-07.24, Rights of Way <br /> A. In section 1-07.24 Rights of Way, page SP-37, line 3, add the following paragraph: <br /> The temporary construction easement areas shown in the Plans shall not be used to <br /> store materials or equipment.The temporary construction easement areas and project <br /> site shall be closed to the public when work is in progress using temporary portable <br /> chain link panel fencing as described in section 1-10 Temporary Traffic Control and <br /> Items No. 4 and No. 6 on this addendum sheet. <br /> ITEM NO. 3—SPECIAL PROVISIONS,SECTION 1-08, Prosecution and Progress <br /> A. In section 1-08.2(02) Hours of Work, page SP-37, line 40, is corrected to read as follows: <br /> Except as modified in section 1-07.23(3) Business Access. <br /> ITEM NO.4—SPECIAL PROVISIONS,SECTION 1-10,Temporary Traffic Control <br /> A. In section 1-10.4 Measurement, page SP-47, line 8, add the following paragraph: <br /> "Project Temporary Traffic Control", per lump sum, includes all costs as described in the I <br /> Standard Specifications, as well all costs to furnish, erect, maintain, move, and remove <br /> temporary portable chain link panel fencing to enclose the project site and temporary <br /> construction easement areas as shown on the Plans and this addendum sheet. <br /> ITEM NO. 5—Proposal, Basic Bid Items <br /> A. In the Basic Bid Items Schedule, page PR-5, item 22, Moving Existing Hydrants, is deleted. <br /> B. in the Basic Bid Items Schedule, page PR-5, item 27, High Visibility Fence, is deleted. <br /> I <br /> II. ADDITIONS,MODIFICATIONS,AND/OR DELETIONS TO THE PLANS <br /> ITEM NO. 6—PLANS <br /> A. Drawings CD1 and CD2, pages 7-8, are replaced with attached drawings. <br /> B. Drawings El, page 26, is replaced with the attached drawing. I <br /> All other requirements of the plans and specifications remain in effect. <br /> This addendum shall be attached to and made a part of the plans and specifications and shall be <br /> acknowledged on the bidder's proposal. <br /> Sincerely,`)(.- <br /> Christina A. Curtis, P.E. <br /> Project Engineer I <br /> I <br /> I <br />