My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 The Contractor shall not use businesses (material suppliers, vendors, subcontractors, <br /> 3 etc.) with federal purchasing exclusions. Businesses with exclusions are identified using <br /> 4 the System for Award Management web page at www.SAM.gov. <br /> 5 <br /> 6 1-08.5 Time for Completion <br /> 7 Item number 2 of the sixth paragraph is supplemented with the following: <br /> 8 <br /> 9 f. A copy of the Notice of Termination sent to the Washington State Department of <br /> 10 Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the <br /> 11 Notice of Termination by Ecology; and no rejection of the Notice of Termination by <br /> 12 Ecology. This requirement will not apply if the Construction Stormwater General <br /> 13 Permit is transferred back to the Contracting Agency in accordance with Section 8- <br /> 14 01.3(16). <br /> 15 <br /> 16 1-08.7 Maintenance During Suspension <br /> 17 The fifth paragraph is revised to read: <br /> 18 <br /> 19 The Contractor shall protect and maintain all other Work in areas not used by traffic. All <br /> 20 costs associated with protecting and maintaining such Work shall be the responsibility of <br /> 21 the Contractor. <br /> 22 <br /> 23 1-09.AP1 <br /> 24 Section 1-09, Measurement and Payment <br /> 25 August 6, 2018 <br /> 26 1-09.2(1) General Requirements for Weighing Equipment <br /> 27 The last paragraph is supplemented with the following: <br /> 28 <br /> 29 When requested by the Engineer, the Contractor's representative shall collect the tickets <br /> 30 throughout the day and provide them to the Engineer's designated receiver, not later than <br /> 31 the end of shift, for reconciliation. Tickets for loads not verified as delivered will receive no <br /> 32 pay. <br /> 33 <br /> 34 1-09.2(2) Specific Requirements for Batching Scales <br /> 35 The last sentence of the first paragraph is revised to read: <br /> 36 <br /> 37 Batching scales used for concrete or hot mix asphalt shall not be used for batching <br /> 38 other materials. <br /> 39 <br /> 40 1-09.10 Payment for Surplus Processed Materials ' <br /> 41 The following sentence is inserted after the first sentence of the second paragraph: <br /> 42 <br /> 43 For Hot Mix Asphalt, the Plan quantity and quantity used will be adjusted for the quantity <br /> 111 <br /> 44 of Asphalt and quantity of RAP or other materials incorporated into the mix. <br /> 45 <br /> i <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PBI7(014); COE#PW3688 Page AM-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.