My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 2-01.AP2 <br /> 2 Section 2-01, Clearing, Grubbing, and Roadside Cleanup <br /> 3 April 1, 2019 <br /> 4 2-01.2(3) Disposal Method No. 3 — Chipping <br /> 5 Item number 2 of the first paragraph is revised to read: <br /> 6 <br /> 7 2. Chips shall be disposed outside of sensitive areas, and in areas that aren't in conflict <br /> 8 with permanent Work. <br /> 9 <br /> ' 10 2-02.AP2 <br /> 11 Section 2-02, Removal of Structures and Obstructions <br /> 12 April 2, 2018 <br /> 13 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> 14 In item number 3 of the first paragraph, the second sentence is revised to read: <br /> 15 <br /> 16 For concrete pavement removal, a second vertical full depth relief saw cut offset 12 to 18 <br /> 17 inches from and parallel to the initial saw cut is also required, unless the Engineer allows <br /> 18 otherwise. <br /> 19 <br /> 20 2-03.AP2 <br /> 21 Section 2-03, Roadway Excavation and Embankment <br /> 22 April 1, 2019 <br /> 23 2-03.3(14)F Displacement of Unsuitable Foundation Materials <br /> 24 This section, including title, is revised to read: <br /> 25 <br /> 26 2-03.3(14)F Vacant <br /> 27 <br /> 28 2-09.AP2 <br /> 29 Section 2-09, Structure Excavation <br /> 30 April 1, 2019 <br /> 31 2-09.2 Materials <br /> 32 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 33 Cement Concrete" are revised to read: <br /> 34 <br /> 35 Cement 9-01 <br /> 36 Fine Aggregate for Concrete 9-03.1(2) <br /> 37 <br /> 38 2-09.3(3)B Excavation Using Open Pits — Extra Excavation <br /> 39 The last two paragraphs are deleted and replaced with the following: <br /> 40 <br /> 41 The excavation height (Ht) shall be calculated within a vertical plane as the difference <br /> 42 between the lowest elevation in the excavation and the highest elevation of the ground <br /> 43 surface immediately adjacent to the excavation. Pavement thickness and other surface <br /> 44 treatments existing at the time of the excavation shall be included in the height calculation. <br /> 45 <br /> 111 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.